• Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
  • Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
  • Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
  • Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
  • Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
  • Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects

Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects

After-sales Service: Online Technical Support, Onsite Installation, Ons
Warranty: One Year
Application: for Wall and Slab Construction in One Operation
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects pictures & photos
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
US $1,400-1,500 / Ton
Min. Order: 10 Tons
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)
  • Overview
  • Product Description
  • Characteristics
  • Production Shows
  • Packaging & Shipping
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
Tunnel Formwork
Surface Treatment
Painted
Material
Full Steel
Shipping
by Sea
Transport Package
Standard Packaging for Shipping
Specification
According to cusomers′ requirments
Trademark
Lianggong
Origin
Jiangsu, China

Packaging & Delivery

Package Size
11.00cm * 8.00cm * 5.00cm
Package Gross Weight
25.000kg

Product Description

Product Description

Tunnel Formwork for Housing

Tunnel form is a formwork system that allows casting of walls and slabs in one operation resulting in a cellular RCC structure. It combines speed, quality, and accuracy with the flexibility and economy of in-situ construction. The system creates an efficient load-bearing structure for use in a wide variety of applications. It is particularly effective in projects suited to repetitive cellular construction such as residential blocks, hotels, student accommodation, barracks, and prisons.
 
The cycle time of the tunnel formwork system lies between 1 to 3 days, which is very little compared to other formwork systems. So tunnel formwork took a lead in the time-saving of projects which indirectly affect the total project cost.
 
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects

 

Characteristics

1 High seismic resistance due to monolithic slab & walls construction
2 Monolithic structure reduces number of joints and improves water tightness
3 Reduce labor costs (greater requirement of tower crane)
4 Reduce mobilization costs on site
5 Reduced construction times (2-3 days slab casting cycle can be achieved) which is up to 3 times faster than conventional
6 Higher quality finishes -Fair faced finish concrete can be achieved
 

Production Shows

Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects

Packaging & Shipping

Packing
 

1 Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2  Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.

Delivery
1 Production: For full container, normally we need 20-30 days after receive customer's down payment.
2 Transportation: It depends on the destination charge port.
3 Negotiation is needed for special requirements.
 
 

Company Profile

Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering ProjectsConcrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering ProjectsConcrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects

FAQ

Q1: Are you trading company or manufacturer ?

A: We are manufacturer.
 
Q2. What do you do?
A: We design and manufacture formworkand scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings,towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
 
Q3: Do you provide samples ? is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to thebuilders.
 
Q5: What is your terms of payment ?
A: Payment<=1,000 USD, 100% in advance. Payment>=10,000 USD, 30% T/T in advance , balance before shipment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects pictures & photos
Concrete Tunnel Formwork System Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction Shear Wall Formwork in Civil Engineering Projects
US $1,400-1,500 / Ton
Min. Order: 10 Tons
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25