• China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
  • China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
  • China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
  • China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
  • China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
  • China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork

China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork

Surface: Powder Coated
Design: Lianggong
Certificate: ISO9001
MOQ: 1set
Color: Blue ,Red or Customized
Transport Package: Standard Package
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)
  • Overview
  • Product Description
  • Detailed Photos
  • Characteristics
  • Packaging & Shipping
  • Our service
  • Company Profile
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Trench box
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308400000

Product Description

 

Product Description

 

Lightweight Trench Box

Trench boxes are used in trench shoring as a form of trench ground support. They offer an affordable lightweight trench lining system. They are most commonly used for ground works operations such as installing utility pipes where ground movement is not critical.

The size of the system required to use for your trench ground support depends on the your maximum trench depth requirements & the size of the pipe sections that you are installing in the ground. Our lightweight trench box system is generally most suitable to trench depths of up to 4 meters and trench width of around 3.7 meters if used in conjunction without variable trench box struts. 

The system is used already assembled in the job site. The trench shoring is made up of a standard 3.00m x H=2.00m panels, connected with adjustable spacers.
If excavation is deeper, it's possible to install elevation elements.
By combining elevation panels to the standard ones the maximum depth reachable is 4,40m in absolute safety.
Detailed Photos

 


China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
China Factory Trench Box Shields Shoring for Ditch Supporting System FormworkChina Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
 
Characteristics

* Easy to assembly on site, installation and removal are significantly reduced

* Box panels and struts are built with simple connections.
* Repeatedly turnover is available.
* This enables easy adjustment for strut and box panel to achieve the required trench widths and depths.
Packaging & Shipping

Packaging:

1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
Our service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
 
Company Profile

 

China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
Customer Photos

 

China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork

China Factory Trench Box Shields Shoring for Ditch Supporting System Formwork
 
FAQ

 

Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25