• Construction Accessories Doka Push Pull Prop
  • Construction Accessories Doka Push Pull Prop
  • Construction Accessories Doka Push Pull Prop
  • Construction Accessories Doka Push Pull Prop
  • Construction Accessories Doka Push Pull Prop
  • Construction Accessories Doka Push Pull Prop

Construction Accessories Doka Push Pull Prop

After-sales Service: Yes
Warranty: 1year
Certification: ISO
Material: Steel
Type: Steel Prop
Surface: Painted
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Push pull prop
Color
Blue,Red,Grey
MOQ
100 PCS
Package
Pullet
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China

Product Description

Product Description

Pull push prop  

The tilted panel brace, with swivel end plates, can bear both vertical and horizontal loads. It is fixed on a wall formwork panel with top end and on ground with base end. By adjusting the turnable handle, the wall form panel is pushed or pulled in to place and then supported in that position.

Due to the high strength capability, the tilted panel braces are used in construction of houses and high-rise buildings.

Various finishing are available, like painting, powder coating, zinc plate, and HDG. The available lengths of the push-pull props are from 1.3m to 10m.



We can as your project requriement to design different specification .



Construction Accessories Doka Push Pull PropConstruction Accessories Doka Push Pull PropConstruction Accessories Doka Push Pull Prop
 Application
Construction Accessories Doka Push Pull Prop

Construction Accessories Doka Push Pull Prop

Characteristic
1.Quick adjustment
Thanks to the telescoping design, working length adjustment can be carried out within seconds . The required adjustment needs only a few turns of the formwork panel brace.

2.Very simple operation on site
All the tilted panel braces can be handled on site for assembly.

 
Packing & Delivery
Packing: 
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.


 
Our Company

Construction Accessories Doka Push Pull Prop



Construction Accessories Doka Push Pull Prop


FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.    

    If you have another question, please feel free to contact us !
 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25