China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 1 Year
Still deciding? Get samples of US$ 5188/Set
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
  • China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
  • China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
  • China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
  • China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
  • China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
Find Similar Products
  • Overview
  • Product Description
  • Characteristics
  • Product Show
  • Packaging & Shipping
  • Our Service
  • Our Company
  • FAQ
Overview

Basic Info.

Model NO.
Hydraulic Auto-Climbing Formwork
Certification
ISO, CE
Material
Steel,Timer Beam H20
Type
Climbing Formwork
Product Name
Climbing Formwork
Keywords
China Hydraulic Formwork System
Title
China Climbing Formwork for Construction
Application
Shear Wall, High Rise Buildings
Advantage
Easy Operation Quick Climbing and High Saftly Coef
Color
Red,Blue, or Customized
Height of Climbing Per Timers
4.5-6meters
Climbing Speed
10mm/Second
Brand Name
Lianggong
Packing
International Standard Package
Height of Bracket
10-15 Meters
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
Transport Package
International Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
730840
Production Capacity
500 Set/Sets Per Month

Packaging & Delivery

Package Size
10.00cm * 10.00cm * 10.00cm
Package Gross Weight
10.000kg
Lead Time
30 days (1 - 10 Sets)
40 days (11 - 20 Sets)
50 days (21 - 50 Sets)
To be negotiated ( > 50 Sets)

Product Description

Product Description

Hydraulic Auto-Climbing Formwork System

The preferred formwork system for high-rise building and bridge construction

China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
The hydraulic auto self climbing formwork system is a wall-attached

self-climbing formwork system, which is powered by its own hydraulic

lifting system. The formwork system (ACS) includes a hydraulic

cylinder, an upper and lower commutator, which can switch the lifting

power on the main bracket or climbing rail. With the power by the

hydraulic system, the main bracket and climbing rail are able to climb

respectively. Therefore, the complete hydraulic auto-climbing system

climbs steadily without crane. No other lifting device is needed when

using the hydraulic auto-climbing formwork, which has the advantages

of being easy to operate, fast and safe in the climbing process. ACS is

the first-choice formwork system for high-rise building construction.

 
 
Characteristics

1.Hydraulic auto-climbing formwork can climb as a complete set or individually. The climbing process is steady, synchronous and safe.
2.The brackets of the auto-climbing formwork system will not be dismantled until the construction period finished, thus saving space for the site and avoiding damage to the formwork, especially to the panel.
3.It provides all-round operating platforms. The contractors do not need to set up other operating platforms, thus saving the cost on material and labor, and improving safety.
4.The error of structure construction is small. As work on correction is simple, the construction error can be eliminated floor by floor.
5.The climbing speed of the formwork system is fast. It can speed up the whole construction work (average 5 days for one floor).
6.The formwork can climb by itself and cleaning work can be done in situ, so that the use of tower crane will be greatly reduced.

Two types of hydraulic auto-climbing formworks:  
HCB-100&HCB-120
Structure diagram of diagonal brace type 
China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building ConstructionHydraulic system
The hydraulic system consists of commutator,  hydraulic system and power distribution device. The upper and lower commutator are important components for the force transmission between the  bracket and the climbing rail. Changing the direction of the commutator can realize the respective climbing of the bracket and climbing rail.
China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
Product Show
 
China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
 
Packaging & Shipping

Packing:

1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 

 
Delivery: 
1 Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2 Transportation: It depends on the destination charge port. 
3 Negotiation is needed for special requirements.

China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
Our Service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company

 

China Lianggong Manufacture Hydraulic Auto Climbing Formwork Systems for Building Construction
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    

If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier