Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete

Product Details
Customization: Available
After-sales Service: Remote Service
Warranty: One Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
  • Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
  • Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
  • Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
  • Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
  • Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
Find Similar Products

Basic Info.

Model NO.
Hollow Plastic Formwork
Thickness
12-18mm
Color
Black/Grey/White/Blue
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
Jiangsu, China

Product Description

Product Description

PP Hollow Plastic Borard

PP hollow building formwork adopts imported high performance engineering resin as the base material, adding chemical additives such as toughening, strengthening, weather proof, anti-aging, and fire proof, etc.

  Specification
1. Standard specification (mm): 1830*915/2440*1220
2. Standard thickness (mm): 12, 15, 18.
3. Product color: black core/white surface, pure gray, pure white.
4. Non-standard specification can be discussed.

 Advantage
1. Reduce costs: reusable more than 50 times.
2. Energy conservation and emission reduction: recyclable.
3. Easy release: no need release agent.
4. Convenient storage: water,sun,corrosion and aging resistance.

5. Easy to maintain: non affinity with concrete, easy to clean up.
6. Lightweight and easy to install:8-10kgs weight per square meter.
7. Fire proof: fire proof hollow formwork can be selected, the fire proof effect reaches V0 level.


Technical  Date
 
Test items Test method Result
Bending test Refer to JG/T 418-2013,section 7.2.5 & GB/T9341-2008 Bending strength 25.8MPa
Flexural modulus 1800MPa
Softening temperature of VEKA Refer to JG/T 418-2013, section 7.2.6 & GB/T 1633-2000 method BO5 75.7 °C

Usage Method

1. This product does not need release agent.
2. In the season or area with large temperature difference between early and midnight, the product will show slight thermal expansion and cold shrinkage. When laying the formwork, we should control the seam between the two boards within 1mm, the height difference between adjacent formworks should less than 1mm, and the joints should be reinforced with wood or steel, to prevent the emergence of uneven; if there is a larger seam, sponge or adhesive tape can be attached to the seams.
3. The spacing of the roof timber brace is adjusted by the thickness of the concrete, under normal construction conditions, for 150mm thickness floor, the center distance of the adjacent wood brace should be 200 to 250mm;
The shear wall with a thickness of 300mm and a height of 2800mm,  the center distance of the adjacent wood brace should be less than 150mm, and the bottom of the wall should have wood brace;
Depending on the thickness and height of the wall to increase or decrease wood brace spacing;
Column width exceed 1 meter must be fixed.
4. The inside corners should have wood brace, for easy connection between the beam and wall.
5. This product can be mixed with plywood of the same thickness.
6. Please use the alloy saw blades with more than 80 mesh to cut the formwork.
7. The use of this product should be disassembled according to the specific location, and avoid unnecessary waste of cutting.
8. strengthen the worker's safety training before use, improve the awareness of fire prevention, and strictly prohibit smoking at the construction area. It is strictly prohibited to use open fire. Fire blankets should be placed near and below the solder joints before welders operation.
Products Show
Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction ConcreteLianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction ConcreteLianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction ConcreteLianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction ConcreteLianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction ConcreteLianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
 
Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
Our Company
Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
 
Customer Photos
 
Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete

Lianggong 50 Times Reusable Hollow Plastic Panel Formwork Material for Construction Concrete
FAQ

Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier