Customization: | Available |
---|---|
After-sales Service: | Remote Service |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Model | Dimention | Area | Unit weight (kg) |
T-Form Panel |
TF1812 | 1800X1200mm | 2.16 | 44.000 |
TF1809 | 1800x900mm | 1.62 | 38.000 | |
TF1806 | 1800x600mm | 1.08 | 30.000 | |
TF1512 | 1500X1200mm | 1.8 | 40.600 | |
TF1509 | 1500x900mm | 1.35 | 33.000 | |
TF1506 | 1500x600mm | 0.9 | 25.000 | |
TF1212 | 1200x1200mm | 1.44 | 32.000 | |
TF1209 | 1200x900mm | 1.08 | 26.000 | |
TF1206 | 1200x600mm | 0.72 | 22.000 | |
TF0909 | 900x900mm | 0.81 | 22.000 | |
TF0906 | 900x600mm | 0.54 | 18.000 | |
TF0606 | 600x600mm | 0.36 | 13.500 |
1.More Quickly:
- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.
2.More Safety:
- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly
3.More Simplicity:
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories
4.Hand-held design:
Largest size panel 1800 x 1200mm only 44kg.
5.Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.
6.Much less cran-time be needed
- Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.
7.Standardized panel for various structure building
- All formwork component can be reusable on different project.
* Hand-held design - largest size 1800x1200mm only 44kg)
* Simple operation - Only Panel & Prop)
* Quick working - up to 400m² per day per 4 worker team
* Standard Panel - suitable for various structure project