Concrete Tunnel Form Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction with Tunnel Formwork for Apartment
Contact Supplier
Product Highlights
- Rapid Casting Cycle: Achieves 2-3 day slab casting cycle, up to 3 times faster than conventional methods.
- High Seismic Resistance: Monolithic slab and walls construction ensures superior structural safety.
- Customized Color Options: Available in Red, Yellow, or fully customized colors to match project needs.
- Improved Water Tightness: Monolithic structure reduces joints, significantly enhancing water tightness.
- Cost Reduction: Reduces labor and mobilization costs while improving overall project efficiency.
- OEM and ODM Services: Full customization available from samples or designs with flexible options.
- Professional Technical Support: Includes online support, onsite installation, and remote or on-site instruction.
- ISO 9001 Certified: Manufactured under international quality management system for global compliance.
Product Attributes
- Customization
- Available
- After-sales Service
- Online Technical Support, Onsite Installation, Ons
- Warranty
- One Year
- Model NO.
- Tunnel Formwork
- Project Soluction Capacity
- Graphic Design, Total Solution for Projects
- Application
- Apartment, Dormitory, Social House and etc
- Surface Treatment
- Painted
- Color
- Red, Yellow or Customized
- Material
- Steel
- Advantage
- Easy, Rapid, Economical and Durable
- Transport Package
- Standard Packaging for Shipping
- Specification
- According to cusomers' requirments
- Trademark
- Lianggong
- Origin
- Jiangsu, China
- HS Code
- 7308400000
- Production Capacity
- 1500t/Month
- Package Size
- 11.00cm * 8.00cm * 5.00cm
- Package Gross Weight
- 25.000kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Concrete Tunnel Form Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction with Tunnel Formwork for Apartment
Find Similar Products
Product Description
Tunnel Form /Tunnel Formwork for Housing Wall and Slab Construction
Tunnel form is a formwork system that allows casting of walls and slabs in one operation resulting in a cellular RCC structure. It combines speed, quality, and accuracy with the flexibility and economy of in-situ construction. The system creates an efficient load-bearing structure for use in a wide variety of applications. It is particularly effective in projects suited to repetitive cellular construction such as residential blocks, hotels, student accommodation, barracks, and prisons.
| 1 | High seismic resistance due to monolithic slab & walls construction |
| 2 | Monolithic structure reduces number of joints and improves water tightness |
| 3 | Reduce labor costs (greater requirement of tower crane) |
| 4 | Reduce mobilization costs on site |
| 5 | Reduced construction times (2-3 days slab casting cycle can be achieved) which is up to 3 times faster than conventional |
| 6 | Higher quality finishes -Fair faced finish concrete can be achieved |
Packing
| 1 | Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. |
| 2 | Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available on customer's request. ---Bulk: Some irregular goods will be loaded in bulk in container. |
Delivery
| 1 | Production: For full container, normally we need 20-30 days after receive customer's down payment. |
| 2 | Transportation: It depends on the destination charge port. |
| 3 | Negotiation is needed for special requirements. |



Q1: Are you trading company or manufacturer ?
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2541548". Items marked "" are certified.
Company Profile
Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service.
During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & Civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.
Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- No. 8, Shanghai Road, Economic Development Zone, Jianhu County, Yancheng, Jiangsu, China
-
Plant Area
- 12870 square meters
-
Number of Employees
- 224
-
Registered Capital
- 19,880,000 RMB
-
Terms of Payment
- LC, T/T
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: one month -
Nearest Port
- Shanghai Port
-
Minimum Order Quantity
- 1 Set
-
Supply Chain Partners
- 25
Our Production Capability & Technical Expertise
-
Main Products
- Construction Formwork (Trench Box, Plastic Formwork, H20 Timber Beam Formwork, Steel Frame Formwork, Aluminium Frame Formwork, Climbing Formwork, T-Form for Slab Construction, Tunnel Formwork)
-
Production Lines
- 10
-
Production Machines
- Laser Cutting Machine, Punching Hole Machine, Stamping Machine, Drilling Machine, Sawing Machine, Shot Blasting Machine, Bending Machine, Welding Robot
-
QA/QC inspectors
- 10 people
-
Inspection Type for Finished Products
- Random inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 45 people
-
Traceability of Raw Materials
- Yes
-
Test Reports for Raw Materials
- Others
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2010-08-25
-
Export Year
- 10 Years
-
Main Markets
- North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic, Oceania
-
Repeat Buyers Choice
- 50%~80%
-
Annual Export Revenue
- 7,272,436 USD
-
Number of Foreign Trading Staff
- 20
-
Overseas Agent/Branch
- Yes
-
New Products Launched in Last year
- Yes
Our Certifications, Standards & Industry Recognition
-
Management System Certification
- ISO9001:2015
-
Cooperated with Fortune 500
- No
FAQ
- Are you a trading company or manufacturer?
- We are a manufacturer.
- What products do you design and manufacture?
- We design and manufacture formwork and scaffolding products for housing, multi-story structures, high-rise buildings, towers, sports stadiums, bridges, hydropower stations, and industrial structures.
- Do you provide samples and is it free?
- Yes, we offer samples free of charge, but the customer must pay the freight cost.
- What services do you offer to construction projects?
- We provide suggestions, formwork layout drawings, quotations, sales to contractors and suppliers, support for peer companies, and remote or on-site instruction.
- What are your terms of payment?
- For payments under 1,000 USD, 100% is required in advance. For payments of 10,000 USD or more, 30% T/T is required in advance with the balance before shipment.
- What is the production lead time?
- For a full container, production typically takes 20-30 days after receiving the down payment.
- Is customization available for this product?
- Yes, we offer full customization, minor customization, and flexible customization from samples or designs.
- What is the warranty period for the tunnel formwork?
- We provide a one-year warranty for our tunnel formwork products.
Send your message to this supplier
People who viewed this also viewed
-
US$40.00-45.00 / Square Meter
-
US$23.00-25.00 / Piece
-
US$50.00-75.00 / Square Meter
-
US$50.00-75.00 / Square Meter
-
US$1,450.00-1,640.00 / Ton
-
US$1,200.00-5,600.00 / Set
-
US$45.00 / Square Meter
-
US$0.80-5.00 / Piece
-
US$50.00-75.00 / Square Meter
-
US$140.00-200.00 / Square Meter
Find Similar Products By Category
- Supplier Homepage
- Products
- Tunnel Formwork Systems
- Tunnel Formwork for Housing
- Concrete Tunnel Form Effective Wall and Slab Tunneling Formwork for Cellular Structure Construction with Tunnel Formwork for Apartment
Related Categories
Hot Searches
- Wall Building Factories
- China Formwork Factories
- Wall System
- Wall Construction
- Formwork Building
- Formwork For Building
- System Formwork
- Construction Concrete Formwork
- Formwork Building System
- Tunneling Formwork Bulkbuy