Customization: | Available |
---|---|
After-sales Service: | Online Technical Support, Onsite Installation, Ons |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tunnel Formwork for Housing
Tunnel form is a formwork system that allows casting of walls and slabs in one operation resulting in a cellular RCC structure. It combines speed, quality, and accuracy with the flexibility and economy of in-situ construction. The system creates an efficient load-bearing structure for use in a wide variety of applications. It is particularly effective in projects suited to repetitive cellular construction such as residential blocks, hotels, student accommodation, barracks, and prisons.1 | High seismic resistance due to monolithic slab & walls construction |
2 | Monolithic structure reduces number of joints and improves water tightness |
3 | Reduce labor costs (greater requirement of tower crane) |
4 | Reduce mobilization costs on site |
5 | Reduced construction times (2-3 days slab casting cycle can be achieved) which is up to 3 times faster than conventional |
6 | Higher quality finishes -Fair faced finish concrete can be achieved |
Packing
1 | Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. |
2 | Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available on customer's request. ---Bulk: Some irregular goods will be loaded in bulk in container. |
1 | Production: For full container, normally we need 20-30 days after receive customer's down payment. |
2 | Transportation: It depends on the destination charge port. |
3 | Negotiation is needed for special requirements. |
Q1: Are you trading company or manufacturer ?