Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building

Product Details
Customization: Available
After-sales Service: Remote Service
Warranty: 1 Year
Still deciding? Get samples of US$ 10/meter
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
  • Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
  • Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
  • Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
  • Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
Find Similar Products

Basic Info.

Model NO.
formwork
Material
Timber
Type
Wall Formwork
Certificate
ISO9001
Average Weight
4.8-5.2kg/M
Transport Package
Pallet Packing
Specification
40*80*200
Trademark
LIANGGONG
Origin
China
HS Code
730840
Production Capacity
20000

Packaging & Delivery

Package Size
200.00cm * 100.00cm * 10.00cm
Package Gross Weight
19.000kg

Product Description

 
Product Description
 
Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building

Timber Beam Formwork for Core Wall and Columns Construction

High flexibility with only a few main components can meet any construction requirements. Timber beam H20, steel waling, plywood and clamp etc...These components can be combined for all shapes, even with the restructuring of wall formwork units when a frequent change of the building structure plans happens. 
The H20 beam is sturdy, easy to handle and at a weight of only 4.8 kg/m offers a high load-bearing capacity at large distances of walings.

Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building

 

Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building



Advantages:
1. Light weight and strong rigidity.
2. Stable in shape due to the highly compressed panels.
3. Water resistant and anti-corrosion treatment allows the beam more durable in site use.
4. Standard size can match well with doka or peri systems., universally used all over the world.
5. made of Finland spruce, water proof painted yellow.

Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building

Adjustable Column Formwork
The adjustment of adjustable column formwork is realized by changing the steel waling relative position
 
Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
The length of steel waling(mm)
Scope of side length of column(mm) to be casted
1600-1900
1000-1400
1600-1300
600-1000
1300-900
200-600

Products Show
Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building
Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise Building


Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise BuildingOur Company
Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise BuildingLianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise BuildingCustomer Photos
Lianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise BuildingLianggong Manufacturer Climbing Formwork Shear Wall Formwork for High Rise BuildingFAQ

Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
Q2:What do you do?
 A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 Q4: What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing. 
Q6: How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project. 
Q7:How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
        If you have another question, please feel free to contact us !




    

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier