• Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka
  • Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka
  • Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka
  • Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka
  • Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka

Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka

Surface Treatment: Nature;Zine Coated
Formwork Design: Lianggong Supply
MOQ: 5 Tons
Size: Standard
After-Sale Service: Online Technical Support, Onsite Installation
Project Soluction Capacity: Graphic Design, 3D Model Design
Samples:
US$ 1.5/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Wedge pin
Certificate
ISO9001
Length
Customization
Desihn Style
Modern
Brand Name
Lianggong
Material
Q235
Type
H-Section Steel
Standard
GB
Trademark
Quality Carbon Structural Steel and Alloy Structural Steel, Lianggong
Forming
Hot-Rolled Steel
Connection Form
Bolt Connection
Member
Steeltruss
Type of Steel For Building Structure
High-Strength Steel
Carbon Structural Steel
Q235
Residential Wall Structure
Wallboard
Application
Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
After-sales Service
One-Stop Service
Warranty
1 Year
Transport Package
Standard Package
Specification
Customized
Origin
China
Production Capacity
500 Tons /Month

Product Description

Product Description

Wedge pin is a fastener and has been used in H20 timber beam formwork system.
Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar DokaConstruction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka


 
Packing & Deliverychars
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 
Our Company
Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar DokaConstruction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka
Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka
Customer Photos

Construction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar DokaConstruction Concrete Shuttering Steel Wedge Pin for Timber Beam Formwork Accessory Similar Doka
 
FAQ
Q: Are you trading company or manufacturer?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock,it is according to quantity.

Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    
    If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25