Building Material Formwork Tie Rod Waterstop Nut for Construction

Product Details
Customization: Available
After-sales Service: Remote Service
Certification: CCC, ISO
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Building Material Formwork Tie Rod Waterstop Nut for Construction
  • Building Material Formwork Tie Rod Waterstop Nut for Construction
  • Building Material Formwork Tie Rod Waterstop Nut for Construction
Find Similar Products
  • Overview
  • Product Description
  • Packing & Delivery
  • Our Service
  • Company Profile
Overview

Basic Info.

Model NO.
Formwork Accessories
Surface Treatment
Galvanized
Technics
Casting
Material
Ductile Iron 450-10
Type
Formwork Accessories
Unit Weight
0.5kg
Dimension
Hex Size: 30mm
Process
Casting
Casting
Casting
Transport Package
Ton Bag
Specification
Various
Trademark
LIANGGONG
Origin
China
Production Capacity
40000PCS/Week

Packaging & Delivery

Package Size
10.00cm * 20.00cm * 30.00cm
Package Gross Weight
20.000kg

Product Description

Product Description

Water stops are for use in water retaining structures. Cast into the concrete wall between two separate rods. After pouring, Tie Rods are removed, water barrier remains in situ. For Tie Rod DG15/17.


Building Material Formwork Tie Rod Waterstop Nut for Construction
Building Material Formwork Tie Rod Waterstop Nut for Construction

Building Material Formwork Tie Rod Waterstop Nut for Construction

Packing & Delivery

Packing Details:Package Box, Steel Pallet, Steel Frame, Container.

Delivery Details:Generally it is 5-30 days, it is according to quantity.
Port:Shanghai

Building Material Formwork Tie Rod Waterstop Nut for Construction

Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 

Company Profile

Lianggong Formwork Co. Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. 


During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together. 
Building Material Formwork Tie Rod Waterstop Nut for Construction
Customer Photos
Building Material Formwork Tie Rod Waterstop Nut for Construction
FAQ
Q1:Are you trading company or manufacturer?
A:We are factory.
Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.
Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.
Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.
Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier