| Customization: | Available |
|---|---|
| After-sales Service: | One-Stop Service |
| Warranty: | One Year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency



| 1 | Bracket,formwork and construction load are all borne by embedded anchors and wall-through tie rods.No additional scaffolding is needed.It is suitable for construction in the high air. |
| 2 | The maximum height of concreting can reach 6 meters,and the whole part of formwork can ba moved back 600 mm. |
| 3 | The formwork part can be adjusted up and down,and form left to right,relatively to the supporting bracket,and the diagonal brace type formwork can be tilted back and forth. |
| 4 | Each connecting parts has a high degree of standardization and versatility. |
| 5 | The formwork can be sdjusted to stick tightly to concrete surface so as to avoid leaking or misaligning. |
| 6 | The bracket system is provided with a suspended platform to facilitate removal of the anchoring parts and the appearance treatment of the concrete. |
Q: Are you trading company or manufacturer ?