Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 1 Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Industry-leading Audited Factory

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
  • Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
  • Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
  • Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
  • Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
  • Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
Find Similar Products
  • Overview
  • Product Feature
  • Product Application
  • Packaging & Shipping
  • Company Profile
  • Honors & Certifications
  • Customer Visit
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
Single-side Bracket
Certification
ISO
Material
Steel
Type
Wall Formwork
Size
100-1200mm * 1500mm (Customizable)
Tolerance
0.05mm
Advantages
Quality Assurance, High Production Efficiency
Color
Customized
Transport Package
Container
Specification
Standard
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
1000 Sets/Per Month

Packaging & Delivery

Package Size
25.00cm * 25.00cm * 25.00cm
Package Gross Weight
1000.000kg

Product Description

Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork

Single-side Bracket

The concrete retaining wall steel single-sided bracket is designed for single-sided concrete pouring. It provides an effective solution for formwork and is widely used in basements, sewage treatment plants, subways and bridge slope protection. The bracket system is simple to install and its design does not require through-wall tie rods, ensuring that the wall is waterproof after pouring. This bracket is particularly effective in spaces where traditional methods are impractical. It controls the lateral pressure of concrete during pouring, thereby simplifying the process and improving safety. With a maximum pouring height of 7.5 meters in one pour, the system ensures efficient and stable concrete pouring. The size and color of the steel single-sided bracket can be customized to meet specific project requirements. It includes brackets, formwork and anchoring components to provide a comprehensive solution for construction projects. This system is a reliable choice for projects that require fast installation, heavy-load support and long-lasting performance. 
 

Product Feature

Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
Feature:
Single-Sided Formwork: Designed for single-sided concrete pouring, the system uses universal components, making construction quick and easy.
No tie rod through the wall: The support system does not require a tie rod that passes through the wall after pouring, which prevents water leakage.
Structural Type: There are two types of supports - truss type and diagonal support type - which can flexibly meet various project needs.
Truss type support: It consists of a standard frame with extended height and can support up to 7.5 meters of concrete in one pour.
Diagonal support support: It has a simple structure and is easy to assemble and disassemble, making

Product Application

Basement exterior wall: suitable for basement wall construction to ensure efficient concrete pouring.
Sewage treatment plant: provides reliable support for the formwork in the construction of sewage treatment plants.
Subway: used in subway tunnel construction to provide firm support for concrete walls.
Road and bridge slope protection: protect the slope during road and bridge construction to ensure stability and safety.
Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork

 

Packaging & Shipping

Packing 1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery 1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
 

Company Profile


Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork

Honors & Certifications

Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork

Customer Visit

Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork

Our Advantages

Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products. Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
 
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork

FAQ


Q1: Are you a factory or trading company?
We are a factory.
Q2: How to get a quotation?
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q3: What is the payment term?
By T/T or L/C.
Q4: What is the lead time?
Generally, it takes 25-30 days according to the quantity.
Q5: What is the package method?
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Q6: Do you have any guarantee on the quality?
We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.
Q7: Do you have on-site supervision service?
Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.
Q8: What benefit can we get from LIANGGONG?
From LIANGGONG , you can get one stop service from design-manufacture-delivery- after sale service.
Q9: Are you looking for agent or distributor in our country?
Yes, we are looking for an agent or distributor worldwide based on a win-win relationship. 
Q10: How to purchase your formwork and scaffolding?
For any order you proceed with, LIANGGONG will follow the following steps.
Step 1. Confirm the order based on our proposal after technical & commercial communication - by the customer, LIANGGONG overseas sales team and technical team.
Step 2. Make the deposit - by the customer.
Step 3. Report on production schedule weekly until completion - by LIANGGONG customer team.
Step 4. Execute pre-shipment inspection - by the customer or the third-party inspection company.
Step 5. The balance payment - by the customer.
Step 6. Arrange the loading and shipment after balance payment - by LIANGGONG customer team.
Step 7. Submit the complete set of shipping documents via courier after departure - by LIANGGONG customer team.
Step 8. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings - by LIANGGONG overseas sales team.
Step 9. Site supervision - by LIANGGONG on-site supervision team.

    Doka Supplier Single-Side Bracket for Shear Wall Concrete Construction Formwork
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier