• 3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
  • 3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
  • 3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
  • 3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener

3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener

After-sales Service: Yes
Warranty: 1year
Application: Formwork Accessory
Surface Treatment: Yes
Technics: Casting
Material: 450-10
Samples:
US$ 20/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
formwork accessory
Type
Accessory
Weight
0.58-0.6
Transport Package
Ton Bag
Specification
Customized
Trademark
LIANGGONG
Origin
China
Production Capacity
40000PCS/Week

Product Description

Product Description

Our company produces a variety of formwork accessories, high quality, low price, can meet the needs of different formwork .

Specification:D15
Height :50mm
Size:70mm
Weight :0.58-0.6kg
Surface : Galvanized
 
3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener

Our Company
3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
Customer Photos



3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener



3 Wing Nut/Anchor Nut /D15 Nut/Formwork Fastener
FAQ

Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.

        If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25