• Permanent Bridge Formwork Systems for Preformed Unit
  • Permanent Bridge Formwork Systems for Preformed Unit
  • Permanent Bridge Formwork Systems for Preformed Unit
  • Permanent Bridge Formwork Systems for Preformed Unit
  • Permanent Bridge Formwork Systems for Preformed Unit
  • Permanent Bridge Formwork Systems for Preformed Unit

Permanent Bridge Formwork Systems for Preformed Unit

Type: Bridge Formwork
Function: Strengthen
Material: Q235
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Permanent Bridge Formwork Systems for Preformed Unit pictures & photos
Permanent Bridge Formwork Systems for Preformed Unit
US $980-1,100 / Ton
Min. Order: 10 Tons
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Other Road and Bridge formwork
Certification
ISO
Colour
Blue, Red and Customized
Technical Support
Remote or on-Site Instruction
Application
Bridge Construction
Transport Package
Standard Packing
Trademark
Lianggong
Origin
China
HS Code
8480600000

Packaging & Delivery

Package Size
465.00cm * 767.00cm * 454.00cm
Package Gross Weight
90.000kg

Product Description

Product Description
Precast girder formwork has advantages of high-precision, simple structure,retractile,easy-demoulding and simple operation. It can be hoisted or dragged to casting site integrally, and demoulded integrally or piecemeal after concrete achieving the strength, then pull out the inner mould from the girder. It is handy installing and debugging, low labor intensity, and high efficient.

Product Show
Permanent Bridge Formwork Systems for Preformed UnitPermanent Bridge Formwork Systems for Preformed UnitPermanent Bridge Formwork Systems for Preformed Unit
Characteristic

1. Construction Simplicity
• easier installation of external post-tensioned tendons
2. Time Savings/Cost Effectiveness
• precast segment to be prefabricated and stored at casting yard while foundation and sub-structure are being built.
• by using efficient erection method and equipment, the rapid installation of viaduct can be achieved.
3. Quality Control Q - A/QC
• precast segment to be produced in factory-manner condition w/ good quality control.
• minimum interruption natural impacts such as bad weather, rain.
• minimum waste of material
• good precision in production
4. Inspection and Maintenance
• external prestressing tendons can be easily inspected and repaired if required.
• maintenance program can be scheduled.

Packing & Delivery

Packaging:
1.Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading. 
2.Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Our Services
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 
Our company
Permanent Bridge Formwork Systems for Preformed Unit
Permanent Bridge Formwork Systems for Preformed Unit

Customer shows
 
Permanent Bridge Formwork Systems for Preformed Unit
Permanent Bridge Formwork Systems for Preformed Unit

 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now