| Customization: | Available |
|---|---|
| After-sales Service: | on-Site Guidance, Online Technical Support |
| Warranty: | One Year |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel Column Formwork
| 1. Easy To Handle: Easy operation, workers under correct direction will be competent for the work. |
| 2. Widely Used:Free size, suitable for any height by connecting different size vertical props together. |
| 3. Improving Construction: Make the construction site neat and clear, improve the project Quality. |
| 4. Recyclable: formwork is spray pained to against rustiness which can be reusable for many times. |
| 5.Strong Build:to support heavy weight and high quality finish. |
Application
Irregular bridge piers, shaft core walls, residencial & commercial buildings, basement, bridge piers, columns ect..




Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.