High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall

Product Details
Customization: Available
After-sales Service: Remote Service
Warranty: One Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
  • High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
  • High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
  • High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
  • High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
  • High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
Find Similar Products

Basic Info.

Model NO.
Climbing Formwork
Certification
ISO9000
Material
Q235 Steel
Type
Climbing Formwork
Height of Climbing Per Times
3-6m
Quantity of Platform
4-7
Application
Piers, Wall,Column,Core Wall
Weight
300kg
Transport Package
Steel Pallet or Customized
Specification
Specification
Trademark
LIANGGONG
Origin
China
Production Capacity
200 Sets/Month

Product Description

Product Description

 

Climbing Formwork (CB180 &CB240)

Climbing formwork CB-240 is mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical. A single pouring height is high and the finished concrete surface is perfect.

The climbing forwork CB-240 has two types of climing units, which are pull-push prop climbing unit and truss climbing unit. The latter is better for the construction form of heavier load, higher height but less inclined angle.

High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall

High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
let's focus on the onsite assembly process of the bracket. Due to its light weight, we only need two workers to finish the whole assembly.
 
1)Below is a picture before assembly.
High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
2)Now they are trying to assemble the whole bracket of cantilever climbing formwork.
High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
3)More details about how to assemble the cantilever climbing bracket.

High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
4)Finished assembling and then use tower crane to move it to the specific spot you want.

High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
Characteristics
High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
Packing & Delivery
Packing:
Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk:Some irregular goods will be loaded in bulk in container

Delivery: 
Production: For full container, normally we need 20-30 days after receive customer's down payment. 
Transportation: It depends on the destination charge port. 
Negotiation is needed for special requirements.

Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall

Our Company
High Quality Crane-Lifted Climbing Bracket Formwork for Retaining Wall/Shear Wall
 FAQ

Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
 A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
 A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier