Customization: | Available |
---|---|
After-sales Service: | Remote Service |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Bridge Formwork | ||
Item | Part name | Bridge Formwork |
1 | Material | Q235B,Q345,Q355 Steel |
2 | Design time | The time of design the fabrication drawings is 5 days. |
3 | Fabrication | The normally time is about 40 days. |
4 | Painting | Each formwork paint three times,a primer,a middle paint,a top paint.Prevent rust corrosion of formwork. |
5 | Delivery | LIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port.LIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port. |
6 | Installation on project site | LIANGGONG can arrange 1-2 enginner to provide technical support to the project site. |
Packing Details:Package Box, Steel Pallet, Steel Frame, Container.
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.