Customization: | Available |
---|---|
After-sales Service: | One-Stop Service |
Warranty: | 1 Year |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Certifications
Standard unit of table formwork
Table formwork standard unit has two sizes:2.44 × 4.88m and 3.3 × 5m .The structure diagram is as follows:
Assembly diagram of standard table formwork
For untypical floor casting, the non-standard table formwork can be designed according to the need. The combination of non-standard and standard table formwork can meet the needs of various shapes of floor pouring.
Edge and middle filler
Table formwork guardrail
The guardrail can be set at the edge of floor as needed, shown in the figure:
Lifting Fork
The lifting fork for table formwork is used for lifting of the table formwork unit, which allows the overall transportation of the large-area table formwork, greatly improving the work efficiency and saving time. There are currently two main types of lifting fork s as shown:
Lifting Fork operation chart
Project application
Shifting Trolly
The shifting trolley is used for the overall transportation of the formwork in the horizontal direction.
Trolley Application Diagram
Packing | 1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. |
2. Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available on customer's request. ---Bulk: Some irregular goods will be loaded in bulk in container. |
|
Delivery | 1. Production: For full container, normally we need 20-30 days after receive customer's down payment. |
2. Transportation: It depends on the destination charge port. |
|
3. Negotiation is needed for special requirements. |
Q1:Are you a factory or trading company?