After-sales Service: | Remote Service |
---|---|
Warranty: | 1 Year |
Type: | Construction Shovel |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Lifting fork is used to lift table formworks up and down or from one floor to another.
Be it in empty condition or with a slab table, the lifting fork always hangs in a horizontal position on the crane. This makes safe unloading from the truck as well as no-risk moving of the slabs along the building structure possible.
Technical Information
Parameter | Type1 | Type2 |
Length | 500cm | 520cm |
Width | 98cm | 106cm |
Height | 646cm | 425cm |
Weight | 803.68kg | 821.9kg |
Bearing load | 1T | 1.5T |
Introduce to use
The Lifting Fork is specially used for lifting the Table Formwork unit. Please ensure that the pins are inserted to the designated positions when using.
It is important to note that the Bracket is only to be used to lift the table formwork unit and not other type of equipment. In order to ensure the stability of the Table formwork, insert two prongs in between the main beam. If this method is inconvenient, you may also insert the prongs directly to the main beam so that the formwork is in vertical position. However, it is best to avoid this scenario.
After completion of concrete pouring for the Table formwork, use the Bracket to lift it to the upper level.
Suppliers with verified business licenses