Customization: | Available |
---|---|
Application: | Formwork System |
Certification: | CE, ISO |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Timber beam lengthening
Standard holes can be punched on both ends of the timber beam. On project site, the timber beam can be lengthened as per need. We can also produce customer-made timber beams at any length.
Packing | 1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. |
2. Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available on customer's request. ---Bulk: Some irregular goods will be loaded in bulk in container. |
|
Delivery | 1. Production: For full container, normally we need 20-30 days after receive customer's down payment. |
2. Transportation: It depends on the destination charge port. | |
3. Negotiation is needed for special requirements. |
Q1: Are you a factory or trading company?
We are a factory.
Q2: How to get a quotation?
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q3: What is the payment term?
By T/T or L/C.
Q4: What is the lead time?
Generally, it takes 25-30 days according to the quantity.
Q5: What is the package method?
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Q6: Do you have any guarantee on the quality?
We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.
Q7: Do you have on-site supervision service?
Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.
Q8: What benefit can we get from LIANGGONG?
From LIANGGONG , you can get one stop service from design-manufacture-delivery- after sale service.
Q9: Are you looking for agent or distributor in our country?
Yes, we are looking for an agent or distributor worldwide based on a win-win relationship.
Q10: How to purchase your formwork and scaffolding?
For any order you proceed with, LIANGGONG will follow the following steps.
Step 1. Confirm the order based on our proposal after technical & commercial communication - by the customer, LIANGGONG overseas sales team and technical team.
Step 2. Make the deposit - by the customer.
Step 3. Report on production schedule weekly until completion - by LIANGGONG customer team.
Step 4. Execute pre-shipment inspection - by the customer or the third-party inspection company.
Step 5. The balance payment - by the customer.
Step 6. Arrange the loading and shipment after balance payment - by LIANGGONG customer team.
Step 7. Submit the complete set of shipping documents via courier after departure - by LIANGGONG customer team.
Step 8. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings - by LIANGGONG overseas sales team.
Step 9. Site supervision - by LIANGGONG on-site supervision team.