• Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
  • Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
  • Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
  • Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
  • Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
  • Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork

Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork

After-sales Service: One-Stop Service
Warranty: One-Stop Service
Material: PP
Grain: Plastic
Bonding Strength: Ⅲ(Nc)
Plywood Type: Veneer Boards
Samples:
US$ 20/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
customization
Formaldehyde Emission Standards
E0
Specifications
1220X2440X12mm/15mm/18mm
Place of Origins
Jiangsu
Grade
Accepts
Usage
Formwork
Type
Plywood
Application
Hotel, Concrete Pouring
Transport Package
Standard Export Package on Pallet.
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
20000pieces/Month

Product Description

Lianggong PP Hollow Formwork Board
Product Introduction

PP hollow building formwork adopts imported high performance engineering resin as the base material, adding chemical additives such as toughening, strengthening, weather proof, anti-aging, and fire proof, etc.

  Specification

1. Standard specification (mm): 1830*915/2440*1220
2. Standard thickness (mm): 12, 15, 18.
3. Product color: black core/white surface, pure gray, pure white.
4. Non-standard specification can be discussed.


 Advantage

1. Reduce costs: reusable more than 50 times.
2. Energy conservation and emission reduction: recyclable.
3. Easy release: no need release agent.
4. Convenient storage: water,sun,corrosion and aging resistance.
5. Easy to maintain: non affinity with concrete, easy to clean up.
6. Lightweight and easy to install:8-10kgs weight per square meter.
7. Fire proof: fire proof hollow formwork can be selected, the fire proof effect reaches V0 level.


Technical Date

 
Test items Test method Result
Bending test Refer to JG/T 418-2013,section 7.2.5 & GB/T9341-2008 Bending strength 25.8MPa
Flexural modulus 1800MPa
Softening temperature of VEKA Refer to JG/T 418-2013, section 7.2.6 & GB/T 1633-2000 method BO5 75.7 °C

Usage Method

1. This product does not need release agent.
2. In the season or area with large temperature difference between early and midnight, the product will show slight thermal expansion and cold shrinkage. When laying the formwork, we should control the seam between the two boards within 1mm, the height difference between adjacent formworks should less than 1mm, and the joints should be reinforced with wood or steel, to prevent the emergence of uneven; if there is a larger seam, sponge or adhesive tape can be attached to the seams.
3. The spacing of the roof timber brace is adjusted by the thickness of the concrete, under normal construction conditions, for 150mm thickness floor, the center distance of the adjacent wood brace should be 200 to 250mm;
The shear wall with a thickness of 300mm and a height of 2800mm,  the center distance of the adjacent wood brace should be less than 150mm, and the bottom of the wall should have wood brace;
Depending on the thickness and height of the wall to increase or decrease wood brace spacing;
Column width exceed 1 meter must be fixed.
4. The inside corners should have wood brace, for easy connection between the beam and wall.
5. This product can be mixed with plywood of the same thickness.
6. Please use the alloy saw blades with more than 80 mesh to cut the formwork.
7. The use of this product should be disassembled according to the specific location, and avoid unnecessary waste of cutting.
8. strengthen the worker's safety training before use, improve the awareness of fire prevention, and strictly prohibit smoking at the construction area. It is strictly prohibited to use open fire. Fire blankets should be placed near and below the solder joints before welders operation.

 
Product Shows
 
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork





Packing and Delivery
Packing Details: Packing Strip, Package Box, Steel Pallet, or according to clients' requests
Delivery Details: Generally it is 5~30 days, it is according to quantity
Port: Shanghai 


Our Services
1. Consulting, Design and Quotation
Offer you a general idea of formwork and scaffold among LIANGGONG various system, to fit your project demand.
2.Manufacture and Quality Inspection
Large- scale production workshop and first- class production line, as well as a professional quality inspection team, which will provide you with a high- quality standard products.
Test report will be available, according to different norms from different regions, in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4. Remote or On-Site Instruction
If you have any questions, we can provide remote or on-site guidance, our aim is to make customers feel at ease and satisfied throughout the whole process.


Our Company
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork

Customer Photos
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork
Factory Price Lianggong PP Hollow Plastic Formwork Board for Construction Formwork

FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. Or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term?
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.

    
If you have any inquiry, pls contact with us directly!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25