Made in China Doka Formwork Alternative Cost-Effective and High-Quality Shaft Beam Formwork for Vertical Shaft Excavation
Contact Supplier
Product Highlights
- Cost-Effective Alternative: High-quality shaft beam formwork serving as a cost-effective alternative to Doka for vertical shaft excavation.
- Wide Adjustable Range: Shaft beams feature an adjustable range of 1.45-5.8 meters, adapting to various shaft widths.
- One-Stop After-Sales: Comprehensive one-stop service including remote or on-site technical instruction and guidance.
- ISO & CE Certified: Products meet international quality standards with ISO and CE certifications for global compliance.
- Customization Support: Supports OEM/ODM and full customization from samples or designs to meet specific project needs.
- Fast Design Quotation: Brief design and quotation provided within 5-7 days after receiving structural drawings.
- Flexible Payment Terms: Accepts T/T and LC payments, with 30% advance for orders over 1000 USD.
- Manufacturer Direct: Direct factory supply with 10 years of export experience and 10 production lines.
Product Attributes
- Customization
- Available
- After-sales Service
- One-Stop Service
- Warranty
- 1 Year
- Model NO.
- Shaft Beam Platform Formwork
- Certification
- ISO, CE
- Material
- Steel Wood
- Type
- Suspension Formwork
- Adjustable Range
- 1.45-5.8 Meters
- Surface
- Painted
- Shaft Width
- Telescopic Length
- Application
- Elevator, Equipment Shaft and Stairwell
- Transport Package
- Standard Package
- Specification
- Customized
- Trademark
- Lianggong Formwork
- Origin
- China
- HS Code
- 848060
- Production Capacity
- 500 Sets/Month
- Package Size
- 25.00cm * 25.00cm * 25.00cm
- Package Gross Weight
- 1000.000kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of Made in China Doka Formwork Alternative Cost-Effective and High-Quality Shaft Beam Formwork for Vertical Shaft Excavation
Find Similar Products
Product Description
casting of shaft of high-rise buildings, such
as elevator, equipment shaft and stairwell.
The lateral pressure of concrete is mainly
borne by the wall-through tie rod, and the
shaft beam platform has the advantages of
being simple, quick and economic in
operation.
Shaft beam platform consists of platform board, timber beam, clamp, shaft beam and anchor.
The structure drawing is as follows:

In the drawing, L is the length of timber beam and W is adjustable. Shaft beams are in a few specifications, ranging
from 1.45m to 5.8m, being adapted to widths of different shafts, and selected as per need.
Type |
Specification |
weight |
Shaft beam1 |
1.45-1.7m | 74.54 |
Shaft beam2 |
1.7-2.1m | 88.68 |
Shaft beam3 |
2.1-2.7m | 120.43 |
Shaft beam4 |
2.7-3.8m | 179.19 |
Shaft beam5 |
3.8-5.9m | 301.87 |
The platform and formwork must be hoisted separately. First, lift the formwork, and then the platform. When the platform is in
place, the claw of the shaft beam must be fixed tightly on the tensile bolt.
Used together with the climbing formwork
The shaft beam platform should be used with other formwork system in construction process. The picture on the below is the
diagram of collaboration of shaft beam platform and cantilever formwork CB-240.
| Packing | 1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. |
2. Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available on customer's request. ---Bulk: Some irregular goods will be loaded in bulk in container. |
|
| Delivery | 1. Production: For full container, normally we need 20-30 days after receive customer's down payment. |
2. Transportation: It depends on the destination charge port. |
|
3. Negotiation is needed for special requirements. |
Till now, we have cooperated with lots of top formwork companies and construction companies, such as DOKA,PERI and etc. Our advanced production equipment and proficient front-line employees will guarantee you products with better quality and less time.
Besides, Lianggong has a professional technical department working together with sales department to ensure our customers' requirements are fully achieved. We offer one-stop service, you can choose products either off-the-shelf or customized.
What's more, our company has established a quality management system that meets the requirements of the international quality management system. Our products have strict quality control from the procurement of raw materials to the sale of finished products which have been used in many projects such as industrial civil engineering works, roads and bridges, hydroelectric dam and nuclear power station. We can accept O E M and O D M.
We sincerely welcome friends from all over the world to visit our company and cooperate with us on the basis of long-term mutual benefits.
For more information, feel free to contact us. We are looking forward to receiving your enquiry soon.
Work Shops
Certifications
Exhibitions And Customer Visits
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products. Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q1:Are you trading company or manufacturer?
A:We are factory.
Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.
Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.
Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.
Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2541548". Items marked "" are certified.
Company Profile
Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service.
During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & Civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.
Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
About Our Factory & Business Background
-
Business Type
- Manufacturer/Factory & Trading Company
- Address
- No. 8, Shanghai Road, Economic Development Zone, Jianhu County, Yancheng, Jiangsu, China
-
Plant Area
- 12870 square meters
-
Number of Employees
- 224
-
Registered Capital
- 19,880,000 RMB
-
Terms of Payment
- LC, T/T
-
International Commercial Terms(Incoterms)
- FOB, CIF, CFR, EXW
-
Average Lead Time
-
Peak Season Lead Time: one month
Off Season Lead Time: one month -
Nearest Port
- Shanghai Port
-
Minimum Order Quantity
- 1 Set
-
Supply Chain Partners
- 25
Our Production Capability & Technical Expertise
-
Main Products
- Construction Formwork (Trench Box, Plastic Formwork, H20 Timber Beam Formwork, Steel Frame Formwork, Aluminium Frame Formwork, Climbing Formwork, T-Form for Slab Construction, Tunnel Formwork)
-
Production Lines
- 10
-
Production Machines
- Laser Cutting Machine, Punching Hole Machine, Stamping Machine, Drilling Machine, Sawing Machine, Shot Blasting Machine, Bending Machine, Welding Robot
-
QA/QC inspectors
- 10 people
-
Inspection Type for Finished Products
- Random inspection(Visual inspection & Function inspection)
-
Inspection Method for Finished Products
- Have instructions and uniformly followed
-
Customization Options
- Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
-
ODM Service Available
- Yes
-
OEM Service Available
- Yes
-
R&D Engineers
- 45 people
-
Traceability of Raw Materials
- Yes
-
Test Reports for Raw Materials
- Others
Our Industry Experience & Global Business Record
-
Year of Establishment
- 2010-08-25
-
Export Year
- 10 Years
-
Main Markets
- North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic, Oceania
-
Repeat Buyers Choice
- 50%~80%
-
Annual Export Revenue
- 7,272,436 USD
-
Number of Foreign Trading Staff
- 20
-
Overseas Agent/Branch
- Yes
-
New Products Launched in Last year
- Yes
Our Certifications, Standards & Industry Recognition
-
Management System Certification
- ISO9001:2015
-
Cooperated with Fortune 500
- No
FAQ
- Are you a trading company or manufacturer?
- We are a factory.
- What products do you manufacture?
- We design and manufacture formwork and scaffolding products for concrete pouring in housing, high-rise buildings, towers, stadiums, bridges, hydropower stations, and industrial structures.
- What services do you provide to customers?
- We offer suggestions, formwork layout drawings, quotations, remote or on-site instruction, and support for worldwide peer companies with outstanding products.
- Do you provide free samples?
- Yes, we offer samples for free charge, but the customer must pay the freight cost.
- What information is needed for a design and quotation?
- We need structural drawings and section drawings to provide a brief design and quotation.
- How long does it take to get a design and quotation?
- In general, it takes 5 to 7 days based on the specific requirements of the construction project.
- What is the production lead time after contract signing?
- In general, it takes 30 to 60 days based on the type and quantity of products to be produced.
- What are your terms of payment?
- For payments <=1000 USD, 100% in advance. For payments >=1000 USD, 30% T/T in advance, with the balance paid before shipment.
Send your message to this supplier
People who viewed this also viewed
-
US$52.99-55.99 / Square Meter
-
US$65.00-69.00 / Square Meter
-
US$30.00 / Piece
-
US$70.00-75.00 / Square Meter
-
US$55.00-65.00 / Square Meter
-
US$40.00-45.00 / Square Meter
-
US$40.00-50.00 / Square Meter
Find Similar Products By Category
- Supplier Homepage
- Products
- Other Formwork Systems
- Shaft Beam Platform
- Made in China Doka Formwork Alternative Cost-Effective and High-Quality Shaft Beam Formwork for Vertical Shaft Excavation
Related Categories
Hot Searches
- Building Material Factories
- China Building Factories
- Construction Building
- Building Glass Factories
- Customized Building
- Formwork Building
- Formwork For Building
- Construction Building Formwork
- Formwork For Building Construction
- Wholesale Building Formwork Bulkbuy