Self-Climbing Edge Protection Screens for High-Rise Building Construction

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Self-Climbing Edge Protection Screens for High-Rise Building Construction
  • Self-Climbing Edge Protection Screens for High-Rise Building Construction
  • Self-Climbing Edge Protection Screens for High-Rise Building Construction
  • Self-Climbing Edge Protection Screens for High-Rise Building Construction
  • Self-Climbing Edge Protection Screens for High-Rise Building Construction
  • Self-Climbing Edge Protection Screens for High-Rise Building Construction
Find Similar Products

Basic Info.

Model NO.
Climbing Formwork
Material
Steel
Type
Climbing Formwork
Certificate
ISO9001
Size
Customization
Surface
Painted
Usage
Protection
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China

Product Description

Product Description
 
Protection Screen and Unloading Platform
Protection screen is a safety system in the construction of high-rise buildings. The system consists of rails and hydraulic lifting system and is able to climb by itself without crane. Protection screen has the entire pouring area enclosed, covering up three floors at the same time, which can more effectively avoid high air fall accidents and ensure the safety of the construction site. The system can be equipped with unloading platforms. After pouring the slab, the formwork and scaffolding can be transported to the unloading platform, and then lifted by tower crane to the upper level for next step working, so that it greatly saves manpower and material resources and improves the construction speed.
The protection screen is an advanced, state-of-the-art system which suits the demand for safety and civilization on site, and it indeed has been widely used in high-rise tower construction.
Further, the exterior armor plate of the protection screen is a good advertising board for publicity of the contractor.
Products Show
Self-Climbing Edge Protection Screens for High-Rise Building Construction
Self-Climbing Edge Protection Screens for High-Rise Building Construction


Anchor system
The anchor and the anchor shoe are the main load bearing parts of the protection screen. The anchor shoe is fixed on the floor by tensile bolt. The anchor system consists of the following components:

Self-Climbing Edge Protection Screens for High-Rise Building Construction

Standard components

Self-Climbing Edge Protection Screens for High-Rise Building Construction
Hydraulic and load bearing system
The power of the protection screen system comes from the hydraulic system, which lifts the climbing rails up gradually, thus enabling the entire protection screen system to climb up 300mm every time. The picture below shows the powering part of the protection screen. Insert the load bearing pin when the rail climbs to the desired position.
The load-bearing device is installed in the middle of each rail as a movable load-bearing part.
Self-Climbing Edge Protection Screens for High-Rise Building Construction
 
Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Our Service
1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company
Self-Climbing Edge Protection Screens for High-Rise Building Construction
Self-Climbing Edge Protection Screens for High-Rise Building Construction

Customer Photos

Self-Climbing Edge Protection Screens for High-Rise Building Construction
Self-Climbing Edge Protection Screens for High-Rise Building Construction
Self-Climbing Edge Protection Screens for High-Rise Building ConstructionFAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.

        If you have another question, please feel free to contact us !

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier