• Underground Pipe Galley Trolley Precast Concrete Mould Construction
  • Underground Pipe Galley Trolley Precast Concrete Mould Construction
  • Underground Pipe Galley Trolley Precast Concrete Mould Construction
  • Underground Pipe Galley Trolley Precast Concrete Mould Construction
  • Underground Pipe Galley Trolley Precast Concrete Mould Construction
  • Underground Pipe Galley Trolley Precast Concrete Mould Construction

Underground Pipe Galley Trolley Precast Concrete Mould Construction

After-sales Service: One-Stop Service
Warranty: One Year
Certification: ISO, CE
Material: Steel
Type: Tunnel Formwork
After-Sale Service: Online Technical Support,Online Installation
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Project Soluctioncapacity
Graphic Design,3D Model Design
Application
Tunnel Trolley
Color
Customized
Package
Standard Package
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308900000
Production Capacity
60000ton/Year

Product Description

Product Description

Pipe Galley Trolley

Pipe gallery trolley is a tunnel built underground in a city, integrating various engineeringpipe gallerys such as electric power, telecommunication, gas, heat and water supply and drainage system. There is special inspection port, lifting port and monitoring system, and planning, design, construction and management for the whole system have been consolidated and implemented. It is an important infrastructure and lifeline for a city's running and management. To suit the market need, our company has developed the TC-120 pipe gallery trolley system. It is a new model trolley which ergonomically integrates the formwork system and trolley into a unity. The formwork can be installed and removed easily by adjusting the spindle strut of the trolley, without disassembling the whole system, thus achieving a safe and quick construction rationale.
 
Products Show
Underground Pipe Galley Trolley Precast Concrete Mould ConstructionUnderground Pipe Galley Trolley Precast Concrete Mould ConstructionUnderground Pipe Galley Trolley Precast Concrete Mould ConstructionUnderground Pipe Galley Trolley Precast Concrete Mould ConstructionUnderground Pipe Galley Trolley Precast Concrete Mould Construction
Packing & Delivery
 
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk:Some irregular goods will be loaded in bulk in container. 
Delivery: 
1.Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2.Transportation: It depends on the destination charge port. 
3.Negotiation is needed for special requirements.
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company
Underground Pipe Galley Trolley Precast Concrete Mould Construction
Underground Pipe Galley Trolley Precast Concrete Mould Construction

Underground Pipe Galley Trolley Precast Concrete Mould Construction
Customer Photos
 
Underground Pipe Galley Trolley Precast Concrete Mould Construction
Underground Pipe Galley Trolley Precast Concrete Mould Construction
Underground Pipe Galley Trolley Precast Concrete Mould Construction
 
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.    
If you have another question, please feel free to contact us !
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25