Product Description
Tunnel Formwork
------for housing construction
Tunnel Formwork is the simpler system. It is light weight and therefore the initial investment is less when compared to other types of tunnel forms. However this non-modular system is more suitable and economical for projects which consists of buildings with similar floor layouts.
Tunnel Form System has many advantages in comparison with the conventional construction systems. Tunnel Form System reduces the costs of construction and shortens the construction period.
Tunnel formwork is a system of formwork that can be used during a normal cycle to cast the walls and formwork of a program. This system produces effective load-bearing structures that are widely used. It is used in the production of buildings like housing, jail houses, and student hostels which have monolitic structure.
Depending on the size of the structure, tunnel formwork system provides casting of a floor in 2 days or in a single day. The buildings which produced by tunnel formwork system are cost efficient, resistant to earthquake, have minimal level of production flaws and have reduced fine-structure labor costs.
Product Parameter
Material |
Q235 |
Surface Treatment |
Spray finish |
Formwork Lifespan |
3-5 years |
Recycling Times |
More than 600 times |
Recycling Speed |
Daily |
Application
Construction site
The tunnel formwork is widely used on construction sites, ensuring smooth progress of projects due to their excellent quality and performance. It demonstrates remarkable load-bearing capacity and durability. Construction workers consistently praise the precision and stability of these products during installation, significantly enhancing the overall quality and safety of the project, achieving the expected results.
Detailed Photos
Characteristics
1 |
High seismic resistance due to monolithic slab & walls construction |
2 |
Monolithic structure reduces number of joints and improves water tightness |
3 |
Reduce labor costs (greater requirement of tower crane) |
4 |
Reduce mobilization costs on site |
5 |
Reduced construction times (2-3 days slab casting cycle can be achieved) which is up to 3 times faster than conventional |
6 |
Higher quality finishes -Fair faced finish concrete can be achieved |
Packaging & Shipping
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Company Profile



FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
If you have other questions, please feel free to contact us !