Customization: | Available |
---|---|
After-sales Service: | One-Stop Service |
Warranty: | One Year |
Still deciding? Get samples of $ !
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
HCB100 System Parameters | |
Model No. | HCB-100 |
Hydraulic System Working Pressure | 100KN |
Platform Quantity | 6 |
Max. loading of Operating Platform | 3.5KN/Sqm. |
Height of Bracket | 12-17 Meters |
Height of Climbing Per Time | 2.7-4.8 Meters |
Climbing Speed | 6 Meters/Hour |
Weight | 1.9 T/Set |
1. The formwork system can climb both vertically and slantwise fast. |
2. The system can climb integrally or separately. The climbing process is steady, synchronous, and safe |
3. The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced |
4. The system will furnish all-round platforms and additional platform is not needed. |
5. The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced. |