Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1200/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cantilever Climbing Formwork
The cantilever climbing formwork CB-240, are mainly used for large-area concrete pouring, such as for dams, piers, anchors, retaining walls, tunnels and basements. The lateral pressure of concrete is borne by anchors and wall-through tie rods, so that no other reinforcement is needed for the formwork. It is featured by its simple and quick operation, wide range adjustment for one-off casting height, smooth concrete surface, and economy and durability.1. Bracket, formwork and construction load are all borne by embedded anchors and wall-through tie rods. No additional scaffolding is needed. It is suitable for construction in the high air.
2. The maximum height of concreting can reach 6 meters, and the whole part of formwork can be moved back 600 mm.
Packing
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.1 | Production: For full container, normally we need 20-30 days after receive customer's down payment. |
2 | Transportation: It depends on the destination charge port. |
3 | Negotiation is needed for special requirements. |
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
Q: Are you trading company or manufacturer ?