• Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork
  • Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork
  • Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork
  • Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork
  • Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork

Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork

After-sales Service: Remote Service
Warranty: One Year
Certification: ISO
Material: Steel
Type: Highway Formwork
Color: Blue,Red , Customized
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Steel Formwork
Surface Treatment
Painted
Use Time
Moren Than 100 Times
Thickness
Customized
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China

Product Description

Product Description

Precast Traffic Barrier Formwork

The barrier is standardized or custom designed to provide a cost-effective way to complete a retaining wall structure.
Special barrier units can be designed to accommodate light poles, electrical conduits, drainage inlets, sound wall posts, sign structures, guide rail transition barrier, bridge approach slabs, tight curves and other odd geometry in the barrier's alignment.
Precast traffic barrier is a solution for retaining walls with vehicular or pedestrian traffic on top. It allows a contractor to set precast barrier units along the top of the wall, greatly reducing the use of cast-in-place concrete. The barrier units are typically eight to twelve feet long, are designed to rest atop the retaining wall, and are delivered to the site with protruding dowels to tie in to the cast-in-place moment slab.

 
Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork
Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork
Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork
Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork
Characteristics
1.To reduce or eliminate cast-in-place concrete
2.For rapid and efficient installation of barrier and coping
3.To eliminate the need for over-hang formwork
3.To eliminate the need for over-hang formwork
5.To hide the top edges of panels
6.If complex aesthetic design is desired

Lianggong has vast experience with traffic barrier design, and continues to refine the process. The barrier is standardized or custom designed to provide a cost-effective way to complete a retaining wall structure.

Packing&Delivery

Packing Details:Package Box, Steel Pallet, Steel Frame, Container.

Delivery Details:Generally it is 5-30 days, it is according to quantity.

Port:Shanghai


Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 
Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork

Our Company

Lianggong Formwork Co.,Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. 

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc. 

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.   
Customer Photos
Lianggong Precast Traffic Barrier Formwork, Cast in-Situ Road Barrier Formwork
FAQ

Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now