Customization: | Available |
---|---|
After-sales Service: | Remote Service |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 4000/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Climbing formwork CB-240 is mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical. A single pouring height is high and the finished concrete surface is perfect.
The climbing forwork CB-240 has two types of climing units, which are pull-push prop climbing unit and truss climbing unit. The latter is better for the construction form of heavier load, higher height but less inclined angle.