Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka

Product Details
Customization: Available
After-sales Service: Online Technical Support
Install: Online Guidance
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Industry-leading Audited Factory

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
  • Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
  • Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
  • Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
  • Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
  • Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
Find Similar Products
  • Overview
  • Product Feature
  • Packaging & Shipping
  • Company Profile
  • Honors & Certifications
  • Customer Visit
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
Steel Waler
Mobility
Adjustable
Usage
Building Platforms, Industrial Platform, Leisure And Entertainment Platform, Stage And Viewing Platform, Transportation Platform
Surface Treatment
Paint Spraying
Formwork Design
Lianggong Supply
MOQ
5 Tons
Size
Standard
After-Sale Service
Online Technical Support, Onsite Installation
Project Soluction Capacity
Graphic Design, 3D Model Design
Certificate
ISO9001
Width&Length
Customization
Desihn Style
Modern
Brand Name
Lianggong
Material
Q235
Thickness
Customization
Feature
Repeatedly Turnover, High Stiffness
Standard
GB
Forming
Hot-Rolled Steel
Transport Package
Standard Package
Specification
Customized
Trademark
Lianggong
Origin
China
HS Code
7308400000
Production Capacity
5000 Tons /Month

Packaging & Delivery

Package Size
25.00cm * 25.00cm * 25.00cm
Package Gross Weight
100.000kg

Product Description

Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka

Steel Waler

We are engaged in manufacturing and supplying a wide range of Steel Waler.These are manufactured using supreme class raw material and latest technology in conformity with set industry norms. To match the international quality standards, these are rigorously tested by our team of quality controllers against various quality parameters. Clients can avail these walers in numerous dimensions according to the application area.
Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka

Product Feature

Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
*High quality and low price
*Repeatedly turnover is available
*Precise dimensions
*Corrosion resistance

Packaging & Shipping

Packing 1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery 1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka

 

 

Company Profile


Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka

Honors & Certifications

Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka

Customer Visit

Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka

Our Advantages

Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
 
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction

 
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka

 

FAQ

Q1: Are you a factory or trading company?
We are a factory.
Q2: How to get a quotation?
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q3: What is the payment term?
By T/T or L/C.
Q4: What is the lead time?
Generally, it takes 25-30 days according to the quantity.
Q5: What is the package method?
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Q6: Do you have any guarantee on the quality?
We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.
Q7: Do you have on-site supervision service?
Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.
Q8: What benefit can we get from LIANGGONG?
From LIANGGONG , you can get one stop service from design-manufacture-delivery- after sale service.
Q9: Are you looking for agent or distributor in our country?
Yes, we are looking for an agent or distributor worldwide based on a win-win relationship. 
Q10: How to purchase your formwork and scaffolding?
For any order you proceed with, LIANGGONG will follow the following steps.
Step 1. Confirm the order based on our proposal after technical & commercial communication - by the customer, LIANGGONG overseas sales team and technical team.
Step 2. Make the deposit - by the customer.
Step 3. Report on production schedule weekly until completion - by LIANGGONG customer team.
Step 4. Execute pre-shipment inspection - by the customer or the third-party inspection company.
Step 5. The balance payment - by the customer.
Step 6. Arrange the loading and shipment after balance payment - by LIANGGONG customer team.
Step 7. Submit the complete set of shipping documents via courier after departure - by LIANGGONG customer team.
Step 8. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings - by LIANGGONG overseas sales team.
Step 9. Site supervision - by LIANGGONG on-site supervision team.

Construction Concrete Shuttering Steel Heavy Duty Spindle for Waler in Formwork Accessories Similar Doka    
    If you have another question, please feel free to contact us !
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier