Customization: | Available |
---|---|
After-sales Service: | on Site |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Drop Head Slab Formwork
Drop Head Slab Formwork is the modular formwork for concrete slab construction.Drop Head Slab Formwork offers a quick and efficient solution to slab construction, with interlocking panels allowing you to customise your forms to suit various slab shapes easily. Its modular design means you can assemble and disassemble these panels quickly,which saves time and labour. And also provides a safe working environment with features like handrails and guardrails incorporated into its design.
Item | Model | Dimention | Area | Unit weight(kg) |
Drophead Slab Formwork Panel | TF1809 | 1800x900mm | 1.62 | 38.00 |
TF1806 | 1800x600mm | 1.08 | 30.00 | |
TF1512 | 1500X1200mm | 1.8 | 40.60 | |
TF1509 | 1500x900mm | 1.35 | 33.00 | |
TF1506 | 1500x600mm | 0.9 | 25.00 | |
TF1212 | 1200x1200mm | 1.44 | 32.00 | |
TF1209 | 1200x900mm | 1.08 | 26.00 | |
TF1206 | 1200x600mm | 0.72 | 22.00 | |
TF0909 | 900x900mm | 0.81 | 22.00 | |
TF0906 | 900x600mm | 0.54 | 18.000 | |
TF0606 | 600x600mm | 0.36 | 13.50 |
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Q1:Are you trading company or manufacturer?
A:We are factory.
Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.
Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.
Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.
Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.