Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building

Product Details
Customization: Available
After-sales Service: on-Site Guidance, Online Technical Support
Warranty: One Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Industry-leading Audited Factory

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building
  • Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building
  • Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building
  • Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building
  • Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building
  • Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Advantage
  • Packaging & Shipping
  • Our Service
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
customized
Certification
ISO, CE
Material
Steel
Type
Slab Formwork
Model No.
Table Formwork
Color
Yellow,Customized
Feature
Simple Structure, Easy Assembly
Timber Beam Weight
4.9kg/M
Thickness of Plywood
15mm,18mm
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
848060
Production Capacity
500 Tons/Month

Packaging & Delivery

Package Size
400.00cm * 220.00cm * 10.00cm
Package Gross Weight
800.000kg

Product Description

Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building

Product Description

Table Formwork

Table Formwork is a kind of formwork that used for floor pouring ,used widely in high-rise building , multi-level factory building, underground structure etc.

During the construction, after the pouring completion , table formwork sets can be lifted by lifting fork to an upper level and reused , without need to dismantle.

Compared with the traditional formwork, it is featured by its simple structure , easy disassembly ,and being reusable. It has eliminated the traditional way of slab support system, which consists of cuplocks,steel pipes and timber planks. The construction speeds up obviously , and manpower has been saved greatly.

It has eliminated the traditional way of slab support system, which consists of cuplocks, steel pipes and timber planks. The construction speeds up obviously, and manpower has been saved greatly.


Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building

 

Detailed Photos

Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building 
Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building
Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building

Advantage

Simple structure, easy assembly.
 
Flexible structure, be adapted to different support system.
 
High construction efficiency with special system tools.

1. Lifting fork for lifting the table formwork to upper floor.

2. Trolley for moving the table formwork on floor.
 

Packaging & Shipping

Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

 
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.

Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Company Profile

Lianggong Table Formwork for Slab Concrete Wooden Formwork Slab Formwork House Building

FAQ

 
Q: Are you trading company or manufacturer ?
A: We are factory.


Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.


Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.

    
Please feel free to contact Claire Peng, if you have any questions!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier