Customization: | Available |
---|---|
After-sales Service: | One-Stop Service |
Warranty: | One Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Steel Frame System
Steel frame formwork is made up of 18mm thick plywood covered with hollow steel. It is a complete product system with many types,such as wall formwork, column formwork, angle formwork and so on. Ancillary products and accessory variety are complete, and product assembly is convenient. It is practical, safe, reliable, cost-saving and applicable to various solutions. As a result, it provides a set of complete and reliable formwork products for building construction, especially wall and column construction.
Easy and simple connections | With the alignment coupler as the only component for all panel connections |
Adjustable alignment Connection | Adjustment ranges from Omm to 150mm, connects with plywood or timber to use as filler plate. |
Adjustable panel | With 50mm adjust modulus, one panel can make as several sizes, easy to reuse to further project |
Easy and fast operation | With minimum panel widths as well as panels heights that can be used both horizontally and vertically. |
Turnover | The steel frame could be used no less than 150 times without damage,lot times turnover means cost saving. |
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.