• Construction Material Cheap Formwork Steel Frame Formwork Euro Form
  • Construction Material Cheap Formwork Steel Frame Formwork Euro Form
  • Construction Material Cheap Formwork Steel Frame Formwork Euro Form
  • Construction Material Cheap Formwork Steel Frame Formwork Euro Form
  • Construction Material Cheap Formwork Steel Frame Formwork Euro Form
  • Construction Material Cheap Formwork Steel Frame Formwork Euro Form

Construction Material Cheap Formwork Steel Frame Formwork Euro Form

After-sales Service: Remote Service
Warranty: 1 Year
Certification: ISO, CE, ISO9001
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Construction Material Cheap Formwork Steel Frame Formwork Euro Form pictures & photos
Construction Material Cheap Formwork Steel Frame Formwork Euro Form
US $26-30 / Piece
Min. Order: 100 Pieces
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Formwork
Material
Q235steel
Type
Wall Formwork
Materials
Steel,Plywood
Application
Hotel, Wall, Column, Core Tube, etc
Place of Origin
Jiangsu, China
Surface Treatment
Spray Painted
Reusable Times
300 Times Reusable
Transport Package
Standard Package
Specification
Standard & Customized
Trademark
Lianggong
Origin
Yancheng, China

Product Description

Product Description

Steel Frame Formwork

Steel frame formwork consists  of steel frame and plywood.After the system is assembled,a whole frame is formed,which has good stability and high bearing capacity.Several independent systems,sunch as wall formwork,slab formwork and support system,are integrated organically,which means all the formwork is assembled in one time,and so is concrete pouring.


Name: Steel frame panel
Surface: Painting 
Material: Q235 
Sizes: Show on the pictures
And we could design by the client sizes and concrete requirement
Packing: Steel Pallet
Plywood: 12mm, 
Standard: European Standard
Loading Port: Qingdao China
Delivery term: 25-30days
Payment Term: T/T
Construction Material Cheap Formwork Steel Frame Formwork Euro FormConstruction Material Cheap Formwork Steel Frame Formwork Euro Form
Construction Material Cheap Formwork Steel Frame Formwork Euro FormConstruction Material Cheap Formwork Steel Frame Formwork Euro FormConstruction Material Cheap Formwork Steel Frame Formwork Euro Form

common size:

A B C D
900 ×150 1200 ×150 1500 ×150 1800 × 150
900 ×250 1200 ×250 1500 ×250 1800 ×250
900 ×350 1200 ×350 1500 ×350 1800 ×350
900 ×450 1200 ×450 1500 ×450 1800 ×450
900 ×550 1200 ×550 1500 ×550 1800 ×550
900 ×200 1200 ×200 1500 ×200 1800 ×200
900 ×300 1200 ×300 1500 ×300 1800 ×300
900 ×400 1200 ×400 1500 ×400 1800 ×400
900 ×500 1200 ×500 1500 ×500 1800 ×500
900 ×600 1200 ×600 1500 ×600 1800 ×600

 weight for each size: 

A/B 900mm 1200mm 1500mm 1800mm
150mm 7.8kg 9.6 kg 12.0kg 13.7kg
200mm 8.7kg 11.1kg 12.8kg 15.5kg
250mm 9.6kg 11.9kg 14.6kg 16.5kg
300mm 10.1kg 12.8kg 16.0kg 17.4kg
 
350mm 11.0kg 13.7kg 17.0kg 19.2kg
400mm 11.9kg 14.6kg 17.8kg 21.0kg
450mm 12.4kg 15.5kg 18.7kg 22.3kg
500mm 13.3kg 16.9kg 20.1kg 24.0kg
550mm 14.2kg 18.3kg 22.0kg 26.0kg
600mm 14.6kg 19.0kg 23.0kg
 
28.0kg
 

 

Commodity steel formwork for building construction  450*1200
Specifications 45# steel or Q235
Colour primary
Length according to customers' requirement
Usage building construction
Technical processing hot rolled
Surface F Type Flattening
Packing 200pcs or 400pcs in a pallet
in a container
MOQ 100pieces

 

1.Raw material of steel frame is 45# high quality steel, the service life of steel frame is more than 300
times;
2.The bamboo plywood high-grade film, the service life of more than 65 times;
3.Red 1200MM is the most commonly used model, keeping in stock all the year round;
4.The above formwork hole type has been adjusted for the domestic construction market, more
convenient and fast;
5.The above models are conventional models, and we can also process various kinds of different
formwork parts according to the actual needs of the customer;


Packing & Delivery

Packing Details :  Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details : Generally it is 5-30 days, it is according to quantity.
Port:  Shanghai
Construction Material Cheap Formwork Steel Frame Formwork Euro FormConstruction Material Cheap Formwork Steel Frame Formwork Euro Form
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 
Our Company
Construction Material Cheap Formwork Steel Frame Formwork Euro Form
Construction Material Cheap Formwork Steel Frame Formwork Euro Form

Customer Photos
 
Construction Material Cheap Formwork Steel Frame Formwork Euro Form
Construction Material Cheap Formwork Steel Frame Formwork Euro Form

 
FAQ
Q: Are you trading company or manufacturer ?
A: We are manufacturer.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance. Payment>=1000USD,30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Construction Material Cheap Formwork Steel Frame Formwork Euro Form pictures & photos
Construction Material Cheap Formwork Steel Frame Formwork Euro Form
US $26-30 / Piece
Min. Order: 100 Pieces
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25