Secured Trading Service

China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge

YANCHENG LIANGGONG FORMWORK CO., LTD.
  • Audited Supplier
  • 8 yrs
  • leading factory

Contact Supplier

Product Highlights

  • Hydraulic Auto-Climbing System: Features hydraulic jacking system for stable, synchronous, and safe vertical or slantwise climbing.
  • High Safety Coefficient: No other lifting devices needed; reduces hazard of formwork breakage and saves field space.
  • All-Round Platform Design: Furnishes complete platforms without needing additional ones; cleaning can be done in situ.
  • Reduced Tower Crane Usage: Self-climbing capability significantly reduces the need for tower crane operations.
  • Flexible Customization: Offers full, minor, and flexible customization from samples or designs based on project needs.
  • ISO9001 Certified Quality: Manufactured with professional quality inspection teams and available test reports for global norms.
  • Remote and On-Site Support: Provides consulting, design, and guidance services remotely or on-site to ensure customer satisfaction.
  • Fast Production Lead Time: Typically 30-60 days for manufacturing after contract signing, depending on product type and quantity.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge

China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge pictures & photos
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge pictures & photos
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge pictures & photos
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge pictures & photos
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge pictures & photos
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge pictures & photos
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
  • China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
  • China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
    China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
  • China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
    China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
  • China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
    China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
  • China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
    China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
  • China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
    China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
  • China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
    China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge

Find Similar Products

Product Description

Product Description

 

Hydraulic Auto-climbing Formwork
 
The power of hydraulic climbing formwork comes from the hydraulic jacking system which contains a hydraulic oil cylinder and a vertical reversing box which can control the lifting rail or the lifting rack. The hydraulic system can generate inter-climbing between the formwork rack and the rail ,so that the hydraulic climbing formwork can climb up stably. During construction, the hydraulic climbing formwork doesn't need other lifting devices, and has advantages of easy operation ,quick climbing and high safety coefficient. It is the first choice for high-rise building construction.

 

Detailed Photos

China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
 
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
 
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
Model  No. HCB-100
Hydraulic System Working Pressure  100KN
Platform Quantity 6
Max. loading of Operating  Platform ≤3.5KN/S.qm
Height of Bracket 12-17 Meters
Height of Climbing Per Time 2.7-4.8 Meters
Climbing Speed 6 Mmeters/Hour
Weight 1.9T 
 

Characteristics

1 The formwork system can climb both vertically and slantwise fast.
2 The system can climb integrally or separately. The climbing process is steady, synchronous, and safe
3 The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced.
4 The system will furnish all-round platforms and additional platform is not needed.
5 The auto-climbing formwork can climb by itself an d cleaning work can be done in situ. The use of tower crane will be greatly reduced.
 

Packaging & Shipping


Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk:Some irregular goods will be loaded in bulk in container. 
Delivery: 
1.Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2.Transportation: It depends on the destination charge port. 
3.Negotiation is needed for special requirements.
 

Our Service


1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 

Company Profile


China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&BridgeChina Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge

Customer Photos

China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge
China Manufacturer Hydraulic Self-Climbing Formwork for High-Rise Building&Bridge

FAQ


Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
 A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
 A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR2541548". Items marked "verified" are certified.

Watch Video
Watch Video
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.
YANCHENG LIANGGONG FORMWORK CO., LTD.

About Our Factory & Business Background

verified Business Type
Manufacturer/Factory & Trading Company
Address
No. 8, Shanghai Road, Economic Development Zone, Jianhu County, Yancheng, Jiangsu, China
verified Plant Area
12870 square meters
verified Number of Employees
224
verified Registered Capital
19,880,000 RMB
verified Terms of Payment
LC, T/T
verified International Commercial Terms(Incoterms)
FOB, CIF, CFR, EXW
verified Average Lead Time
Peak Season Lead Time: one month
Off Season Lead Time: one month
verified Nearest Port
Shanghai Port
verified Minimum Order Quantity
1 Set
verified Supply Chain Partners
25

Our Production Capability & Technical Expertise

verified Main Products
Construction Formwork (Trench Box, Plastic Formwork, H20 Timber Beam Formwork, Steel Frame Formwork, Aluminium Frame Formwork, Climbing Formwork, T-Form for Slab Construction, Tunnel Formwork)
verified Production Lines
10
verified Production Machines
Laser Cutting Machine, Punching Hole Machine, Stamping Machine, Drilling Machine, Sawing Machine, Shot Blasting Machine, Bending Machine, Welding Robot
verified QA/QC inspectors
10 people
verified Inspection Type for Finished Products
Random inspection(Visual inspection & Function inspection)
verified Inspection Method for Finished Products
Have instructions and uniformly followed
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes
verified R&D Engineers
45 people
verified Traceability of Raw Materials
Yes
verified Test Reports for Raw Materials
Others

Our Industry Experience & Global Business Record

verified Year of Establishment
2010-08-25
verified Export Year
10 Years
verified Main Markets
North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic, Oceania
verified Repeat Buyers Choice
50%~80%
verified Annual Export Revenue
7,272,436 USD
verified Number of Foreign Trading Staff
20
verified Overseas Agent/Branch
Yes
verified New Products Launched in Last year
Yes

Our Certifications, Standards & Industry Recognition

verified Management System Certification
ISO9001:2015
verified Cooperated with Fortune 500
No

FAQ

Are you a trading company or manufacturer?
We are factory.
What do you do?
We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
What can you do for us?
We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects. We sell our products to the contractors, building companies, material supplier or trading companies. We support our worldwide peer companies with our outstanding formwork or scaffolding products. We provide remote or on-site instruction to the builders.
Do you provide samples? Is it free or extra?
Yes, we could offer the sample for free charge but do not pay the cost of freight.
What do you need in order to make a brief design and quotation when we have a construction project to be built?
Structural drawing and section drawing.
How long does it take to make a brief design and quotation after we offer the structural drawing?
In general, it takes 5~7 days based on specific requirements of construction project.
How long does it take to manufacture the products after the signing of contract?
In general, it takes 30~60 days based on the type and quantity of products to be produced.
What is your terms of payment?
Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now