Liannggong Tunnel Form Construction Steel Formwork

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Liannggong Tunnel Form Construction Steel Formwork
  • Liannggong Tunnel Form Construction Steel Formwork
  • Liannggong Tunnel Form Construction Steel Formwork
  • Liannggong Tunnel Form Construction Steel Formwork
  • Liannggong Tunnel Form Construction Steel Formwork
  • Liannggong Tunnel Form Construction Steel Formwork
Find Similar Products

Basic Info.

Model NO.
Tunnel Formwork
Material
Steel
Type
Tunnel Formwork
Waling Speed
8m/Min
Traveling Motor
15kw
Certificate
ISO9001
Transport Package
Standard Package
Specification
6-12m
Trademark
LIANGGONG
Origin
China
HS Code
7308900000
Production Capacity
60000ton/Year

Product Description

Product Description

Tunnel Form system 
Tunnel form system, is a system of steel formworks which avails simultaneous casting of concrete walls and slab of a building. The formwork surfaces that face the concrete are sheet-iron and provides a smooth surface concrete. Additional plasterind is not required. Tunnel formwork system is a system which provides; approximately 500 castings depending on utilisation conditions, cost effi ciency, maximized labor safety by use of scaffolding systems and casting of concrete every single day.
Tunnel form system is used in the production of buildings like housing, jail houses, and student hostels which have monolitic structure. Depending on the size of the structure, tunnel formwork system provides casting of a fl oor in 2 days or in a single day. The buildings which produced by tunnel formwork system are cost effi cient, resistant to earthquake, have minimal level of production fl aws and have reduced fi ne-structure labor costs. Tunnel formwork system is preferred for military buildings aswell.
Products Show

Liannggong Tunnel Form Construction Steel Formwork
Liannggong Tunnel Form Construction Steel Formwork
Liannggong Tunnel Form Construction Steel Formwork
Liannggong Tunnel Form Construction Steel Formwork
Liannggong Tunnel Form Construction Steel Formwork

Characteristics
1.Light weight; 
2.Simple, strong and stable structure; 
3.Moved, mounted and stripped easily; 
4.Strong reusability; 
5.Small deformation under force; 
6. Adequate space under traveler and providing a big space for bars and formwork construction operation.
Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 

Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.


Liannggong Tunnel Form Construction Steel Formwork
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Liannggong Tunnel Form Construction Steel Formwork
Our Company
Liannggong Tunnel Form Construction Steel Formwork
Liannggong Tunnel Form Construction Steel Formwork
Customer Photos
 
Liannggong Tunnel Form Construction Steel Formwork
Liannggong Tunnel Form Construction Steel Formwork

Liannggong Tunnel Form Construction Steel Formwork
FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier