Concrete Shield Trench Shoring/Box Supporting System Construction Formwork

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: One Year
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make at Made-in-china.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Concrete Shield Trench Shoring/Box Supporting System Construction Formwork
  • Concrete Shield Trench Shoring/Box Supporting System Construction Formwork
  • Concrete Shield Trench Shoring/Box Supporting System Construction Formwork
  • Concrete Shield Trench Shoring/Box Supporting System Construction Formwork
  • Concrete Shield Trench Shoring/Box Supporting System Construction Formwork
  • Concrete Shield Trench Shoring/Box Supporting System Construction Formwork
Find Similar Products
  • Overview
  • Product Description
  • Product Shows
  • Packing&Delivery
  • Our Service
  • Our Company
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Formwork System
Material
Steel
Type
Trench Box
Reusable Times
More Than 300 Times
Application
Ditch
Surface Tretment
Painted
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308400000

Packaging & Delivery

Package Size
1200.00cm * 250.00cm * 290.00cm
Package Gross Weight
100000.000kg

Product Description

Product Description


                                                         LiangGong Trench Box

Trench boxes are used in trench shoring as a form of trench ground support. They offer an affordable lightweight trench lining system. They are most commonly used for ground works operations such as installing utility pipes where ground movement is not critical.

The size of the system required to use for your trench ground support depends on the your maximum trench depth requirements & the size of the pipe sections that you are installing in the ground. Our lightweight trench box system is generally most suitable to trench depths of up to 4 meters and trench width of around 3.7 meters if used in conjunction without variable trench box struts. 

The system is used already assembled in the job site. The trench shoring is made up of a standard 3.00m x H=2.00m panels, connected with adjustable spacers.
If excavation is deeper, it's possible to install elevation elements.
By combining elevation panels to the standard ones the maximum depth reachable is 4,40m in absolute safety.
Concrete Shield Trench Shoring/Box Supporting System Construction FormworkConcrete Shield Trench Shoring/Box Supporting System Construction Formwork

Product Shows

 

Concrete Shield Trench Shoring/Box Supporting System Construction FormworkConcrete Shield Trench Shoring/Box Supporting System Construction FormworkConcrete Shield Trench Shoring/Box Supporting System Construction Formwork
Concrete Shield Trench Shoring/Box Supporting System Construction Formwork
Concrete Shield Trench Shoring/Box Supporting System Construction FormworkConcrete Shield Trench Shoring/Box Supporting System Construction Formwork
 

Packing&Delivery

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
Concrete Shield Trench Shoring/Box Supporting System Construction Formwork

Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company

Lianggong Formwork Co.,Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. 

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc. 

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
Concrete Shield Trench Shoring/Box Supporting System Construction Formwork   

Concrete Shield Trench Shoring/Box Supporting System Construction Formwork

Customer Photos

Concrete Shield Trench Shoring/Box Supporting System Construction Formwork

FAQ

Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.
Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.

If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier