
Exhibitions And Customer Visits
Table Formwork
Table formwork is a kind of formwork that used for floor
pouring , used widely in high-rise building , multi-level
factory building , underground structure etc. During the
construction, after the pouring completion, table
formwork sets can be lifted by lifting fork for an upper
level and reused, without need to dismantle. Compared
with the traditional formwork, it is featured by its simple
structure, easy disassembly, and being reusable. It has
eliminated the traditional way of slab support system,
which consists of cuplocks, steel pipes and timber
planks. The construction speeds up obviously, and
manpower has been saved greatly.
Standard unit of table formwork
Table formwork standard unit has two sizes:2.44 × 4.88m and 3.3 × 5m .The structure diagram is as follows:

Assembly diagram of standard table formwork


For untypical floor casting, the non-standard table formwork can be designed according to the need. The combination of non-standard and standard table formwork can meet the needs of various shapes of floor pouring.
Edge and middle filler

Table formwork guardrail
The guardrail can be set at the edge of floor as needed, shown in the figure:

Lifting Fork
The lifting fork for table formwork is used for lifting of the table formwork unit, which allows the overall transportation of the large-area table formwork, greatly improving the work efficiency and saving time. There are currently two main types of lifting fork s as shown:

Lifting Fork operation chart

Project application

Shifting Trolly
The shifting trolley is used for the overall transportation of the formwork in the horizontal direction.

Trolley Application Diagram

| Packing |
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
|
2. Different packages are used for different products: ---Bundles: Timber beam, steel props, tie rod, etc. ---Pallet: Small parts will be put in bags and then on pallets. ---Wooden cases: It is available on customer's request. ---Bulk: Some irregular goods will be loaded in bulk in container.
|
| Delivery |
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
|
2. Transportation: It depends on the destination charge port.
|
3. Negotiation is needed for special requirements.
|

Certifications

Exhibitions And Customer Visits
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand. Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products. Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Q1:Are you a factory or trading company?
We are a factory.
Q2: How to get a quotation?
You can send us your project structural drawing or the material list for a quotation. Our engineer team will give your formwork solution.
Q3:What is the payment term?
By T/T or L/C.
Q4:What is the lead time?
Generally, it takes 25-30 days according to the quantity.
Q5:What is the package method?
We have standard package such as steel pallets, ton bags etc. , which suits to container transportation.
Q6:Do you have any guarantee on the quality?
We guarantee the quality of different products. If necessary, you can arrange a third-party company to inspect the product quality in our factory.
Q7:Do you have on-site supervision service?
Yes, we have an on-site supervision service for most of our projects worldwide except for a few restriction regions.
Q8:What benefit can we get from LIANGGONG?
From LIANGGONG , you can get one stop service from design-manufacture-delivery- after sale service.
Q9:Are you looking for agent or distributor in our country?
Yes, we are looking for an agent or distributor worldwide based on a win-win relationship.
Q10:How to purchase your formwork and scaffolding?
For any order you proceed with, LIANGGONG will follow the following steps.
Step 1. Confirm the order based on our proposal after technical & commercial communication - by the customer, LIANGGONG overseas sales team and technical team.
Step 2. Make the deposit - by the customer.
Step 3. Report on production schedule weekly until completion - by LIANGGONG customer team.
Step 4. Execute pre-shipment inspection - by the customer or the third-party inspection company.
Step 5. The balance payment - by the customer.
Step 6. Arrange the loading and shipment after balance payment - by LIANGGONG customer team.
Step 7. Submit the complete set of shipping documents via courier after departure - by LIANGGONG customer team.
Step 8. Submit the complete set of the user manual, calculation, shop drawing and assembly drawings - by LIANGGONG overseas sales team.
Step 9. Site supervision - by LIANGGONG on-site supervision team.