Customization: | Available |
---|---|
After-sales Service: | Online Technical Support, Onsite Installation |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No. | Name | Specification(mm) | Unit weight(kg) | Material |
1 | Wall formwork(big) | LG-QT1200*600*75 | 9.8 | ABS |
2 | LG-QT400*600*75 | 3.2 | ABS | |
3 | LG-QT300*600*75 | 2.5 | ABS | |
4 | LG-QT250*600*75 | 2.2 | ABS | |
5 | LG-QT180*600*75 | 1.6 | ABS | |
6 | LG-QT200*600*75 | 2 | ABS | |
7 | Wall formwork (small) | LG-QT200*200*75 | 0.8 | ABS |
8 | LG-QT200*250*75 | 1 | ABS | |
9 | LG-QT250*250*75 | 1.1 | ABS | |
10 | LG-QT300*250*75 | 1.3 | ABS | |
11 | LG-QT300*300*75 | 1.45 | ABS | |
12 | LG-QT300*200*75 | 1.1 | ABS | |
13 | Outer angle formwork | LG-WJ250*600*75 | 2.8 | ABS |
14 | LG-WJ75*75*600 | 0.5 | ABS | |
15 | Inner angle formwork | LG-NJ250*100*600*75 | 2.85 | ABS |
16 | LG-NJ250*100*250*75 | 1.5 | ABS | |
17 | LG-NJ250*100*200*75 | 1.2 | ABS | |
18 | LG-NJ250*100*300*75 | 1.6 | ABS | |
19 | Point angle | LG-ZNJ250*250*100 | 1.5 | ABS |
20 | Adjustable column formwork | 675*600*75 | 5.85 | ABS |
21 | 725*600*75 | 6 | ABS | |
22 | Accessories | Handle | 0.09 | ABS |
23 | Washer | 0.02 | ABS |
Name | ABS Plastic Panel Formwork For Column Concrete |
Height | 750mm |
Diameter | 300mm,350mm,400mm,450mm |
Application | Hotel,department |
Design Style | Modern |
Product name | Formwork Clamp Plastic Concrete Formwork For Plastic Building |
Feature | Adjustable Size |
Package | Steel Pallet |
Certification | SGS/ISO9001.... |
Weight | 13kg/sqm |
MOQ | 100PCS |
Life Time | Over 100 times |
Delivery Time | 7-30days |
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.