• Construction Material of Steel Frame Formwork
  • Construction Material of Steel Frame Formwork
  • Construction Material of Steel Frame Formwork
  • Construction Material of Steel Frame Formwork
  • Construction Material of Steel Frame Formwork
  • Construction Material of Steel Frame Formwork

Construction Material of Steel Frame Formwork

Certification: ISO
Material: Steel
Type: Steel Frame Formwork
Color: Blue,Red,Customized
Aplication: Highway, Railway, Bridges Construction
Reusable Times: 5~10 Years Reusable
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
formwork
Surface Treatment
Spray Painted
Size
Customized
Type of Steel for Building Structure
High Strength Steel Q235 Q345
Transport Package
Container
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
5000 Square Meters/Month

Product Description

Product Description

Steel frame formwork

Steel frame formwork consists  of steel frame and plywood.After the system is assembled,a whole frame is formed,which has good stability and high bearing capacity.Several independent systems,sunch as wall formwork,slab formwork and support system,are integrated organically,which means all the formwork is assembled in one time,and so is concrete pouring.
Products Show
Construction Material of Steel Frame Formwork
Construction Material of Steel Frame Formwork
Construction Material of Steel Frame Formwork
 
Packing & Delivery
 
Packing Details :  Package Box, Steel Pallet, Steel Frame, Container.
Delivery Details : Generally it is 5-30 days, it is according to quantity.
Port:  Shanghai
 
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.


2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.


3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company
Construction Material of Steel Frame Formwork
Construction Material of Steel Frame Formwork
Customer Photos
 
Construction Material of Steel Frame Formwork
Construction Material of Steel Frame Formwork

FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD, 30% T/T in advance,balance before shippment.
    
If you have another question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25