Lianggong Shoring Tower Scaffolding Vertical Support

Product Details
Customization: Available
After-sales Service: Online Technical Support, Onsite Installation
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Lianggong Shoring Tower Scaffolding Vertical Support
  • Lianggong Shoring Tower Scaffolding Vertical Support
  • Lianggong Shoring Tower Scaffolding Vertical Support
  • Lianggong Shoring Tower Scaffolding Vertical Support
Find Similar Products

Basic Info.

Model NO.
Scaffolding Tower
Scaffolding Part Type
Scaffolding Frames
Move Method
Horizontal Mobile Scaffolding
Construction Properties
Installation Scaffold
Supporting Mode
Floor Type Scaffolding
Transport Package
Standard Package
Specification
1000*1000*1200
Trademark
Lianggong
Origin
Jiangsu, China
Production Capacity
500 Meters/Month

Product Description

Product Description

Ring-lock stair tower

The structure of the ring-lock stair tower is the same as that of the φ60 ring-lock scaffolding, and the cross-section dimension of the stair tower is 1.5×3.0 m. The safety of the stair tower is quick to assemble and disassemble, and the force is reasonable.
Bearing capacity of the stair tower 
As the height of the tower erection increases, the force it bears decreases. When it is set to 150m, it can still withstand the force of 0.25KN/m×150m=37.5KN, so it is safe to work when it is 150m high (the tower must be attached to the wall every 4.5m).

Products Show  
Lianggong Shoring Tower Scaffolding Vertical Support
Lianggong Shoring Tower Scaffolding Vertical Support
Lianggong Shoring Tower Scaffolding Vertical Support

Packing & Delivery

Packing:

1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Our Service 
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Lianggong Shoring Tower Scaffolding Vertical Support

Our Company
Lianggong Shoring Tower Scaffolding Vertical Support
Lianggong Shoring Tower Scaffolding Vertical Support
Customer Photos

Lianggong Shoring Tower Scaffolding Vertical Support
Lianggong Shoring Tower Scaffolding Vertical Support
Lianggong Shoring Tower Scaffolding Vertical Support


FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term?
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
If you have another question, please feel free to contact us!
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier