Lianggong High Quality Plywood for Formwork System
Product Description
Plywood mainly covers birth plywood, hardwood plywood and poplar plywood, and it can fit into panels for many formwork systems, for example, steel frame formwork system, single side formwork system, timber beam formwork system, steel props formwork system, scaffolding formwork system, etc… It is economic and practical for construction concrete pouring.
Product Name |
Plywood |
Face/Back |
Black, Brown |
Core |
Poplar, Hardwood, Birch, and so on |
Glue Type |
Melamine WBP, Phenolic WBP |
Grade |
First class ( two times hot press) |
Edges Processing |
Waterproof Paint |
Size |
1220*2440MM; 1250*2500MM; 1830*915MM or 6000MM*2000MM |
Thickness |
12mm, 15mm,18mm, 21mm |
Size Tolerance |
+/-0.2mm |
Thickness Tolerance |
+/-0.5mm |
Moisture Contents |
8%-14% |
Usage |
Construction |
MOQ |
1*20GP |
Price Terms |
FOB, CIF |
Payment Terms |
T/T, L/C, and so on |
Delivery Time |
Within 15 days after receiving deposit |
Characteristics
1. High recycle usage times:
According to the quality grades and using & maintain method, our plywood could be used more than 20 times.
1) High weight
2) No Deformation
3) High Quality Film
4) Precise dimensions
2. Multi-purpose usage in formwork system:
Plywood Formwork could be used for wall, slab, column, beam and bridge concrete pouring etc
1) Provide large size film faced plywood or Customers designed
2) More convenient
3) Easy to Cut
3. Easy to cleaning:
It only used water to clean and the plastic or nylon tools are the best choice to clean the residues of concrete.
Detailed Photos
Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.Our Company
Customer Photos
FAQ
Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
Q2:What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q4: What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6: How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7:How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, please feel free to contact us !