• Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
  • Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
  • Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
  • Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
  • Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
  • Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction

Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction

After-sales Service: Remote Service
Warranty: One Year
Type: Wall Formwork
Unit Weight: Around 15kg/Sqm
Permitted Fresh Concrete Pressure: 60 Kn/Sqm or Customized
Usage Time: 100 Times
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Plastic Formwork
Color
Black or Customized
Feature
Modular Design
MOQ
100 Square Meters
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
Jiangsu, China

Product Description

Product Description

Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
Lianggong Plastic Wall Formwork  is a new material formwork system made from ABS. It provides project sites with convenient erection with light weight panels thus are very easy to handle. It also saves your cost greatly compared with other material formwork systems.

It has been sold to Singapore, Indonesia, Canada, Nepal, Malaysia, etc. Below is some common size for refer:
o. Name  Specification(mm) Unit Area
(m2)
Unit Weight
(KG)
Volume
(CBM)
Remark 
Wall formwork
(big)
LG-QT1200*600*75 Pcs 0.72  9.80  0.0540  For Wall,column Slab and beam
LG-QT400*600*75 Pcs 0.24  3.20  0.0180 
LG-QT300*600*75 Pcs 0.18  2.50  0.0135 
LG-QT250*600*75 Pcs 0.15  2.20  0.0113 
LG-QT180*600*75 Pcs 0.11  1.60  0.0081 
LG-QT200*600*75 Pcs 0.12  2.00  0.0090 

Wall formwork
(small)
LG-QT200*150*75 Pcs 0.03  0.55  0.0023  For small size wall
LG-QT200*200*75 Pcs 0.04  0.80  0.0030 
LG-QT200*250*75 Pcs 0.05  1.00  0.0038 
10  LG-QT250*150*75 Pcs 0.04  0.69  0.0028 
11  LG-QT250*250*75 Pcs 0.06  1.10  0.0047 
12  LG-QT300*250*75 Pcs 0.08  1.30  0.0056 
13  LG-QT300*300*75 Pcs 0.09  1.45  0.0068 
14  LG-QT300*200*75 Pcs 0.06  1.10  0.0045 
15  LG-QT300*150*75 Pcs 0.05  0.82  0.0034 
16  LG-QT350*200*75 Pcs 0.07  1.28  0.0053 
17  LG-QT350*150*75 Pcs 0.05  1.05  0.0039 
18  Outer angle formwork LG-WJ250*600*75 Pcs 0.20  2.80  0.0149  outer corner assembly
19  Outer angle formwork LG-WJ75*75*600 Pcs 0.09  0.50  0.0017 
20  Inner angle formwork LG-NJ250*100*600*75 Pcs 0.21  2.85  0.0150  Inner corner assembly
21  LG-NJ250*100*250*75 Pcs 0.09  1.50  0.0063 
22  LG-NJ250*100*200*75 Pcs 0.07  1.20  0.0050 
23  LG-NJ250*100*300*75 Pcs 0.11  1.60  0.0075 
24 
Point angle
LG-ZNJ250*250*100 Pcs 0.12  1.50  0.0063 
25  Accessories Handle Pcs   0.09  - For connector
26  Accessories Washer Pcs   0.02  -
27  Adjustable Column formwork 675*600*75 Pcs 0.41  5.85  0.0304  For column
28  Adjustable Column formwork

725*600*75

 
Pcs 0.44  6.00  0.0326
  
Application

Common structure type - Wall
Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction

Common structure type - Column

Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction

Common structure type - Floorslab
Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction

Other available plastic formwork construction types:

1.Bridge Cap Pouring                                                            
2.The side wall of the subway project 
 
Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction

Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for ConstructionCheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
Characteristic

1.Long lifespan& Cost effective -- Plastic formwork can be reused over 100 times,while Plywood can only be reused 3 to 5 times.Therefore the Plastic Formwork is more cost effective.

2.Waterproof --  As the nature of plastic material. It's imputrescible and rustless,especially suitable for underground and watery circumstance.

3.Interlocking Design -- No release agent needed, good effect of demolding.

4.Easy deassembly -- The template will be separated easily from concrete 

5.Simple Installation -- Light weight and safe to handle, easy cleaning and very robust.

6.High Quality -- Abrasion resistance, excellent mechanical property, best impermeability. 

7.Recycable -- Waste scrap molding board could be recycled.

Packing&Delivery

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles:Timber beam, steel props, tie rod, etc. 
---Pallet:Small parts will be put in bags and then on pallets. 
---Wooden cases:It is available on customer's request. 
---Bulk:Some irregular goods will be loaded in bulk in container. 

Delivery: 
1.Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2.Transportation: It depends on the destination charge port. 
3.Negotiation is needed for special requirements.
Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction
Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.

4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.

Our Company

Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service. 

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc. 

Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.

Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for ConstructionCheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction

 Customer Photos

Cheap 100 Times Reusable Adjustable Plastic Column Formwork Concrete Pillar Mould Panel System for Construction

FAQ

Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.


Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
 A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
 A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25