Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork

Product Details
Customization: Available
After-sales Service: Yes
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Industry-leading Audited Factory

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
  • Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
  • Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
  • Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
  • Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
  • Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
Find Similar Products

Basic Info.

Certification
ISO, CE
Material
Steel
Type
Slab Formwork
Surface Treatment
Powder Coated
Certificate
ISO9001
Color
Blue ,Red or Customized
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
8480600000
Production Capacity
5000 Square Meter/Per Month

Product Description

Product Description

T-Form Systm

Item  Model  Dimention  Area Unit weight
(kg)

T-Form Panel
TF1812 1800X1200mm 2.16 44.000 
TF1809 1800x900mm 1.62 38.000 
TF1806 1800x600mm 1.08 30.000 
TF1512 1500X1200mm 1.8 40.600 
TF1509 1500x900mm 1.35 33.000 
TF1506 1500x600mm 0.9 25.000 
TF1212 1200x1200mm 1.44 32.000 
TF1209 1200x900mm 1.08 26.000 
TF1206 1200x600mm 0.72 22.000 
TF0909 900x900mm 0.81 22.000 
TF0906 900x600mm 0.54 18.000 
TF0606 600x600mm 0.36 13.500 
 

1.More Quickly:

- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.

2.More Safety:

- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly

3.More Simplicity:

- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories

4.Hand-held design:

Largest size panel 1800 x 1200mm only 44kg.

5.Only Panel & Prop

- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.

6.Much less cran-time be needed

- Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.

7.Standardized panel for various structure building

- All formwork component can be reusable on different project.


Products Show
Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete FormworkScaffolding Formwork Slab Formwork Square Steel System Metal Concrete FormworkScaffolding Formwork Slab Formwork Square Steel System Metal Concrete FormworkCharacteristics

* Hand-held design - largest size 1800x1200mm only 44kg)
* Simple operation - Only Panel & Prop)
* Quick working - up to 400m² per day per 4 worker team
* Standard Panel - suitable for various structure project

Packing & Delivery
Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.
Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
Our Company
Yancheng Lianggong Formwork Co., Ltd. is one of the leading formwork and scaffolding companies headquartered in Nanjing City, China, with its factories located in Jianhu Economic Development Zone of Yancheng City, Jiangsu Province. As a well-established company in construction formwork field, Lianggong has been devoted itself and specialized in formwork and scaffolding research, development, manufacturing, and labor service.

During the years of hardworking since 2010 by the whole company staff, Lianggong has successfully delivered and served a large number of projects at home and abroad, such as bridges, tunnels, power stations, and industrial & civil constructions. Major products of Lianggong include H20 timber beam, wall and column formwork, plastic formwork, single-sided bracket, crane-lifted climbing formwork, hydraulic auto-climbing system, protection screen and unloading platform, shaft beam, table formwork, ring-lock scaffolding and stair tower, cantilever forming traveller and hydraulic tunnel lining trolley, etc.

Company is mainly engaged in management and technical personnel have many years engaged in large Bridges, tunnels, civil engineering construction background, in line with international standards in the domestic first to launch the formwork system of industrialization of professional design, manufacture, the formwork construction specialized subcontracting integration concept, the formwork system to the European advanced technology and domestic mature manufacturing process for effective union, formed a mature and standard formwork technology development, application and service system, greatly improving the domestic construction contracting enterprise in formwork engineering technology integration capabilities, to enhance the domestic construction contracting enterprise comprehensive strength and efficiency.


Utilizing its strong technical background and abundant engineering experience, and always bearing in mind to keep its cost-effectiveness and efficiency for clients, Lianggong will continue to be your best partner in any project from the very start and achieve higher and further goals together.
Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
Customer Photos
 
Scaffolding Formwork Slab Formwork Square Steel System Metal Concrete FormworkScaffolding Formwork Slab Formwork Square Steel System Metal Concrete Formwork
 
FAQ
Q: Are you trading company or manufacture?
A:We are factory.
Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free but you need pay for the freight cost.
Q: What's your payment term
A: ≤ $1,000, 100% inadvance, ≥$1,000, 30% TT in advance, balance before shipment.
        If you have another question, please feel free to contact us !
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier