Drop Head Slab Table Formwork for Building Constructiion

Product Details
Customization: Available
After-sales Service: on Site
Warranty: One Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Exhibition Experience
The supplier had participated in offline trade shows, you can check the Audit Report for more information
to see all verified strength labels (29)
  • Drop Head Slab Table Formwork for Building Constructiion
  • Drop Head Slab Table Formwork for Building Constructiion
  • Drop Head Slab Table Formwork for Building Constructiion
  • Drop Head Slab Table Formwork for Building Constructiion
  • Drop Head Slab Table Formwork for Building Constructiion
  • Drop Head Slab Table Formwork for Building Constructiion
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Characteristics
  • Packing & Delivery
  • Our Service
  • Company Profile
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Steel Frame Formwork
Certification
ISO
Material
Steel+Plywood
Color
Blue,Red , Customized
Usage
Slab Construction
Length
Customized
Surface
Painted
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
8480600000
Production Capacity
5000 Square Meter/Per Month

Product Description

Product Description

T-Form Systm

Item  Model  Dimention  Area Unit weight(kg)
T-Form Panel TF1809 1800x900mm 1.62 38.00
TF1806 1800x600mm 1.08 30.00
TF1512 1500X1200mm 1.8 40.60
TF1509 1500x900mm 1.35 33.00
TF1506 1500x600mm 0.9 25.00
TF1212 1200x1200mm 1.44 32.00
TF1209 1200x900mm 1.08 26.00
TF1206 1200x600mm 0.72 22.00
TF0909 900x900mm 0.81 22.00
TF0906 900x600mm 0.54 18.000 
TF0606 600x600mm 0.36 13.50
1.More Quickly:

- Quickly erection and dismantlement rate up to 100 m2 slab formwork per person every day.
- Efficient solutions for infill zones, beams, shear wall and dropping slab area.
- Minimal need for craneage during set-up and transfer.

2.More Safety:
- High strength ability panel.
- Self lock clamp
- Pre-designed panel layout ensures every panel is put up correctly

3.More Simplicity:
- Only hammer be required in operation.
- Manual erection and movement, minimal crane required
- Simple infill component is needed to fill the gap zone
- Easy to train and work with
- Multipurpose accessories

4.Hand-held design:
Largest size panel 1800 x 1200mm only 44kg.

5.Only Panel & Prop
- No deck beam design, easy to be managed, storage, repair and seach.
- Minimal prop and panel numbers, more clean, more wide working space.
- Speed working: quickly erection and dismantle, time-saving infill solution for joint wall & column, drop area, beam and cantilever solution.

6.Much less cran-time be needed
- Working can move ahead rapidly, independently and without interruption even when the crane is fully occupied. The crane is no longer a 'chorke point' duiing formwork setup.

7.Standardized panel for various structure building
- All formwork component can be reusable on different project.

 

Detailed Photos

 
Drop Head Slab Table Formwork for Building Constructiion
Drop Head Slab Table Formwork for Building Constructiion
Drop Head Slab Table Formwork for Building Constructiion
Drop Head Slab Table Formwork for Building Constructiion

Drop Head Slab Table Formwork for Building Constructiion

Characteristics

* Hand-held design - largest size 1800x1200mm only 44kg
* Simple operation - Only Panel & Prop
* Quick working - up to 400m² per day per 4 worker team
* Standard Panel - suitable for various structure project

 

Packing & Delivery

Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Our Service

1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.
Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.

2.Manufacture and Quality Inspection

Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.

3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
 

Company Profile

Drop Head Slab Table Formwork for Building ConstructiionDrop Head Slab Table Formwork for Building Constructiion

Customer Photos

Drop Head Slab Table Formwork for Building Constructiion

FAQ


Q1:Are you trading company or manufacturer?
A:We are factory.

Q2:What do you do?
A:We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing,multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D:We provide remote or on-site instruction to the builders.

Q4:Do you provide samples? is it free or extra?
A:Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A:Structural drawing and section drawing.

Q6:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 5~7 days based on specific requirements of construction project.

Q7:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q8:What is your terms of payment?
A:Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier