• Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
  • Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
  • Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
  • Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
  • Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
  • Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork

Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork

After-sales Service: 1 Year
Warranty: 1 Year
Certification: ISO, CE
Samples:
US$ 20/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork pictures & photos
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
US $3-5 / Piece
Min. Order: 1,000 Pieces
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
to see all verified strength labels (29)

Basic Info.

Model NO.
Formwork
Material
Steel
Type
Climbing Formwork
Design Style
Contemporary
Usage
Formwork System Meterails
Project Solution Capability
Graphic Design, 3D Model Design, Total Solution Fo
MOQ
1000 PCS
Transport Package
Package Box, Steel Pallet, Steel Frame, Container
Specification
Customized
Trademark
LIANGGONG
Origin
Yancheng, China
Production Capacity
2000 PCS/Day

Product Description

Product Description
 
Hydraulic Auto-climbing Formwork
 
The power of hydraulic climbing formwork comes from the hydraulic jacking system which contains a hydraulic oil cylinder and a vertical reversing box which can control the lifting rail or the lifting rack. The hydraulic system can generate inter-climbing between the formwork rack and the rail ,so that the hydraulic climbing formwork can climb up stably. During construction, the hydraulic climbing formwork doesn't need other lifting devices, and has advantages of easy operation ,quick climbing and high safety coefficient. It is the first choice for high-rise building construction.

Products Show
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump FormworkManufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump FormworkManufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump FormworkManufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
Characteristic
1 The formwork system can climb both vertically and slantwise fast
2 The system can climb integrally or separately. The climbing process is steady, synchronous, and safe
3 The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced
4 The system will furnish all-round platforms and additional platform is not needed
5 The auto-climbing formwork can climb by itself an d cleaning work can be done in situ. The use of tower crane will be greatly reduced
 
 
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
Packing & Delivery
Packing:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork



Our Service
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump FormworkOur Company
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump FormworkManufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump FormworkCustomer Photos
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump FormworkManufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump FormworkFAQ

Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
Q2:What do you do?
 A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q3: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
 Q4: What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, material supplier or trading companies.
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5:What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing. 
Q6: How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project. 
Q7:How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
        If you have another question, please feel free to contact us !




    

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork pictures & photos
Manufacturer Metal Formwork System Climbing Formwork System Construction Concrete Formwork for Pier Bridge Dam Shear Wall Retaining Wall/Jump Formwork
US $3-5 / Piece
Min. Order: 1,000 Pieces
Diamond Member Since 2019

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25