Customization: | Available |
---|---|
After-sales Service: | Online Technical Support, Onsite Installation, Ons |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 119/Square Meter
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
H20 Timber Beam Formwork System
Flat Formwork
The Flat formwork system consists of plywood, H20 timber beam, steel waler and lifting hook. The plywood and the timber beam are connected by the self-tapping screw. Steel waler and timber beam are connected with flange clamp. Two hooks are arranged symmetrically on both sides of the timber beam. The timber beam is assembled on site by standardized accessories, which is convenient for disassembly and assembly. It is light in weight and convenient for construction and transportation. The formwork panel is plywood, and the board surface is smooth, being good for water absorption and air transmission. Without being tainted, the concrete surface has good appearance, in high quality and turnover rates. Thus, it has been widely used in walls, columns, piers and dams.
Adjustable Arced Formwork
Plywood is utilized for the panel of adjustable arced formwork, as it has a certain toughness and can be deformed without being damaged after applying an appropriate external force. By taking its such features and geometric principles, the adjustment system is used to bend the panel into the designed arcs. The adjacent adjustable arced formwork unit can be seamlessly connected by adjustable frame clamps. This formwork system is suitable for any arced piers with radius longer than 2 meters.
Packing
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
1 | Production: For full container, normally we need 20-30 days after receive customer's down payment. |
2 | Transportation: It depends on the destination charge port. |
3 | Negotiation is needed for special requirements. |
1.Consulting,Design,and Quotation
Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
Q: Are you trading company or manufacturer ?