• China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
  • China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
  • China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
  • China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
  • China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
  • China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka

China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka

After-sales Service: Online Technical Support
Warranty: 1 Year
Certification: ISO
Material: Steel Wood
Type: Wall Formwork
Product Name: China Concrete Formwork
Samples:
US$ 99/Square Meter 1 Square Meter(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Jiangsu, China
to see all verified strength labels (29)
  • Overview
  • Product Description
  • Product Show
  • Packaging & Shipping
  • Our Service
  • Our Company
  • Customer Photos
  • FAQ
Overview

Basic Info.

Model NO.
Timber formwork System
Keyword
Wood Formwork
Title
China Timber Beam Formwork System for Construction
Application
Column, Wall and Column Concrete Construction
Usage
Adjustable
Color
Yellow, Blue, or Customized
Size
Customised
Package
Standard Package
Surface Treatment
Yellow Waterproof Painting
Transport Package
Standard Package
Specification
Customized
Trademark
LIANGGONG
Origin
China
HS Code
7308400000
Production Capacity
500 Square Meter/Square Meters Per Month

Product Description

Product Description

Timber Beam Formwork

Flat formwork
The Flat formwork system consists of plywood, H20 timber beam, steel waler and lifting hook. The plywood and the timber beam are connected by the self-tapping screw. Steel waler and timber beam are connected with flange clamp. Two hooks are arranged symmetrically on both sides of the timber beam. The timber beam is assembled on site by standardized accessories, which is convenient for disassembly and assembly. It is light in weight and convenient for construction and transportation. The formwork panel is plywood, and the board surface is smooth, being good for water absorption and air transmission. Without being tainted, the concrete surface has good appearance, in high quality and turnover rates. Thus, it has been widely used in walls, columns, piers and dams.  
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka

The assembly process

Positioning of walers

Lay walers on the platform at the distance shown in the drawing. Mark the positioning line on the walers and draw the diagonal lines. Let the diagonal lines of the rectangle that is composed by any two walers equal to each other.
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
Timber beam assembling

Lay a timber beam at both ends of the waler according to the dimension shown in the drawing. Mark the positioning line and draw the diagonal lines. Make sure the diagonal lines of the rectangle that is composed by two timber beams equal to each other. Then fix them by flange clamps. Connect the same end of the two timber beams by a thin line as the benchmark line. Lay other timber beams according to the benchmark line and ensure that they are parallel to timber beams on both sides. Fix each timber beam with clamps.
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
Installing lifting hook on timber beam

Install lifting hooks according to the dimension on the drawing. Clamps must be used on both sides of the timber beam where the hook is located, and ensure that the clamps are fastened.
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
Laying panel

Cut the panel according to the drawing and connect the panel with the timber beam by self-tapping screws.
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
Formwork lifting 

The assembled formwork can be lifted in a complete set as shown in the figure.
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
Product Show
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
Packaging & Shipping

Packing

1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery
1 Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2 Transportation: It depends on the destination charge port. 
3 Negotiation is needed for special requirements.
 
Our Service

1.Consulting,Design,and Quotation

Offer you a general idea of formwork & scaffold among LiangGong various systems, to fit your project demand.Design and Customized forming & shoring proposal according to your structural drawing by Auto-CAD.
2.Manufacture and Quality Inspection
Large-scale production workshop and First-class production line, as well as a professional quality inspection team, which will provide you with high quality standard products.
Test report will be available according to different norms from different regions in order to offer no worries to clients or meet destination authority requirements.
3.Packing and Shipment
From fabrication to loading, use standard export packages to get to your site quickly.
4.Remote or On-site instruction
If you have any questions, we can provide remote or on-site guidance. Our aim is to make customers feel at ease and satisfied throughout the process.
Our Company

China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to DokaChina Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka

Customer Photos

China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka

 
China Lianggong Formwork & Scaffolding Manufacture Timber Beam Formwork for Wall/Column/Slab/Bridge/Dam Concrete Construction Similar to Doka
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?
A: Generally it is 5-15 days if the goods are in stock or it is 15-20 days if the goods are not in stock.It is according to quantity.

Q: Do you provide samples ? Is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD,100% in advance.Payment>=1000USD,30% T/T in advance,balance before shippment.
    

If you have another question, please feel free to contact us !
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2019

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
150
Year of Establishment
2010-08-25