Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 1 Year |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Part name | Steel Formwork |
1 | Material | Q235B,Q345,Q355 Steel |
2 |
Design time |
The time of design the preliminary technical scheme is 3days |
The time of design the fabrication drawings is 5 days. | ||
3 | Fabrication | The normally time is about 40 days. |
4 | Painting | Each formwork paint three times,a primer,a middle paint,a top paint.Prevent rust corrosion of formwork. |
5 | Delivery | LIANGGONG with a number of logistics to maintain long-term good relations of cooperation,to ensure the timely delivery of formworks to the port. |
6 | Installation on project site | LIANGGONG can arrange 1-2 enginner to provide technical support to the project site. |